top of page

Crane, Rigging & Lifting Operations H&S File – South Africa | Edition 1

R 1 299,95 Regular Price
R 799,95Sale Price

THE CRANE CERTIFICATE IS ONLY ONE PIECE OF A SAFE LIFT.

A suspended load depends on actual radius, ground bearing, outrigger deployment, rigging selection, wind, signaller positioning and an effective exclusion zone. Small changes can invalidate a previously safe lifting plan. The AVC Crane, Rigging & Lifting Operations Health & Safety File combines the contractor management framework with dedicated trade controls.

A–AA: THE COMPLETE CONTRACTOR SAFETY-FILE FOUNDATION

The foundational A–AA sections include company/project particulars, statutory appointments, worker competence, risk assessment, work methods, emergency arrangements, inspections, registers, general toolbox talks and incident management. Complete the sections relevant to your submission and any additional law or client/site requirements.

AB ONWARDS: AVC'S EXTRA, PURPOSE-DEVELOPED TRADE TOOLKIT

AVC developed specialist AB checklists and registers for lift planning, load weight and radius, ground-bearing and outrigger assessments, slings/shackles and tackle inspections, rigger/signaller competencies, tandem or unusual lifts where relevant, weather STOP criteria, exclusion and signal arrangements and written lift release. These resources were developed for this trade, informed by South African and international best practices.

KEEP CONTROL OF THE WORK—NOT JUST THE PAPERWORK

Use the lift-specific prestart and rigging check before picking up the load, then document changed conditions and the supervisor's authorisation. Keep the extra AB registers, checklists and toolbox talks in the company/supervisor library and print the forms relevant to each job. Where required by risk or site rules, use them at the workface.

SITE SAFETY OFFICER REQUESTS CHANGES? AVC WILL ASSIST

Ask the reviewer to put specific comments in writing. AVC assesses warranted omissions or technically appropriate corrections to the purchased standard file and, where justified, revises and reissues it free of charge. Site acceptance remains the client's decision.

COMPLETE SAFETY FILE, RELATED PACKAGE OR R12.95 SINGLES

The complete file gives you both A–AA and trade-specific AB controls. Already have the management core? The related 36-document Crane & Rigging package is R215.95 (about R6.00 each). Singles are R12.95. Check your included forms to avoid duplicate purchases.

Explore the Crane & Rigging Checklist Package.

Browse individual Checklist Singles at R12.95 each.

COMPANY BRANDING, BESPOKE DEVELOPMENT OR A PRINTED BINDER

AVC separately quotes on your logo/colours, tailored documentation and a professionally printed, indexed and divided lever-arch Safety File packed for delivery.

Contact AVC for personalisation and printing.

South Africa • Editable Word. Apply actual project conditions, relevant engineering/design checks, competent people, manufacturer instructions and legal requirements. Templates alone confer no site approval.

    bottom of page