AVC Crane, Rigging & Lifting Operations Checklists, Registers & Records Package
A LIFT SHOULD NEVER START ON AN ASSUMPTION ABOUT GROUND OR LOAD.
A suspended load depends on actual radius, ground bearing, outrigger deployment, rigging selection, wind, signaller positioning and an effective exclusion zone. Small changes can invalidate a previously safe lifting plan.
36 EDITABLE TRADE WORKING FORMS
36 editable records: 14 checklists, 8 competency records, 11 registers, 2 records and an index. Ground bearing, setup and outriggers, slings, signal teams, planned radius, load movement, weather and release.
TRADE-SPECIFIC EVIDENCE FOR THE REAL WORKFACE
Use the lift-specific prestart and rigging check before picking up the load, then document changed conditions and the supervisor's authorisation. This package supplies editable working records, not the full A–AA H&S management foundation.
BUY THE PACKAGE, THE COMPLETE FILE OR SELECT SINGLES
The 36-document ZIP is R215.95 (approximately R6.00 each) versus R12.95 per Single. The full Crane, Rigging & Lifting Operations Safety File includes A–AA and purpose-developed AB specialist controls. Avoid buying documents you already own.
View the full Crane, Rigging & Lifting Operations Contractor Safety File.
Browse individual Checklist Singles at R12.95 each.
ELIGIBLE INDIVIDUAL SINGLES: BUY 4, GET 1 FREE
When active, the discount applies to qualifying Singles, not this full ZIP. Check the offer in your cart before payment.
BRANDING, CUSTOM DOCUMENTS OR PROFESSIONAL PRINTING
Ask AVC for a separate quotation for tailored, company-branded or printed/indexed lever-arch Safety Files.
Contact AVC for a customised or printed Safety File.
Digital editable Word files • South Africa. Complete each record for actual hazards, approved arrangements, equipment and competent-person checks.

