top of page

AVC-PORTS-AQ-TB-02 | Drydock Repair & Vessel Stability Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Automatic offer on eligible individual checklists: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Browse individual checklists. Confirm the discount in your cart before checkout.

Pick 5. Pay for 4.

AVC-PORTS-AQ-TB-02 — TOOLBOX TALK: Drydock repair and vessel stability

WHERE AND WHY THIS RECORD EXISTS

Brief the actual crew before the activity described by AQ-TB-02 at an operating port or marine terminal. The talk belongs to vessel, slipway and drydock maintenance with separate shipowner, master and terminal interfaces. It connects the job, vessel/cargo activity, approved work boundary and stop-work triggers to the people doing the work.

WHAT THE ORIGINAL FORM ACTUALLY CHECKS

FIVE DISCUSSION POINTS PRINTED IN THE ORIGINAL FORM: 1) Never remove shore supports or blocks without the docking engineer.; 2) Check flooding alarm and emergency exit access at each shift.; 3) Control sparks and paint/chemical releases into dock drainage.; 4) Coordinate load transfers and large lifts with dock master.; 5) Do not declare the vessel serviceable without qualified acceptance.

HOW TO COMPLETE AND RETAIN IT

Enter the actual port/terminal, contractor, work order and area or shift. Discuss each numbered point against the real equipment, movement plan and authority conditions; record job-specific unresolved risks/actions and have the facilitator sign and date. The original A4 Word attendance register provides 16 name/personnel ID and signature lines. Keep it with the toolbox record and active port workpack.

AUTHORITY, HOLD AND APPLICABILITY

Operator, terminal, Harbour Master and vessel Master permissions remain with the party actually controlling that activity. This Word record supports traceable contractor verification; it does not issue a port access pass, marine permit, equipment certificate or guaranteed terminal acceptance. In the complete master, Section AB remains compulsory; choose the full AC–AU annexure only when the awarded work requires this specialist trade.

TRY THIS SINGLE OR SEE THE COMPLETE AVC SYSTEM

ONE ORIGINAL FORM, A 199-FORM PACKAGE OR THE COMPLETE FILE: This individual A4 editable Microsoft Word document costs R12.95. The 199-document Ports, Harbours & Marine Terminals Checklist Package costs R1,193.95 (approximately R6 per record). The full 440-page Ports Contractor Health and Safety File is currently R1,899.95 and already includes all 199 forms, the A–AA management core, all 51 compulsory AB records and the 19 specialist trade annexures. See the detailed Singles to understand exactly where and how to use the form before choosing the full package. Prices may change.

Explore all 199 Ports forms | Complete 440-page Ports Safety File

    bottom of page