top of page

AVC-PORTS-AQ-H02 | Drydock Flooding & Vessel Support Hold

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Automatic offer on eligible individual checklists: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Browse individual checklists. Confirm the discount in your cart before checkout.

Pick 5. Pay for 4.

AVC-PORTS-AQ-H02 — DRYDOCK FLOODING, VESSEL SUPPORT & OPERATOR CLEARANCE

WHERE AND WHY THIS RECORD EXISTS

Use this formal HOLD/RELEASE record when the relevant vessel, slipway and drydock maintenance with separate shipowner, master and terminal interfaces activity may not safely progress or be returned to port operations until specific evidence has been reviewed and the responsible operator has accepted it.

WHAT THE ORIGINAL FORM ACTUALLY CHECKS

HOLD POINTS PRINTED ON THIS RECORD: 1) Dock Master/authorised docking authority, vessel Master and contractor roles recorded before mobilisation.; 2) Dock block/staging layout, structural load paths and vessel stability conditions confirmed by competent parties.; 3) Dock gate/caisson, ballast, flooding valves, pumps and automatic controls included in authorised isolation.; 4) Tide and planned docking/undocking programme cross-checked against access and rescue routes.; 5) No unapproved hot work or access beneath vessel, props or hull in jeopardised or changing support configuration.; 6) Emergency flooding, power loss and evacuation arrangements jointly rehearsed or briefed for shift.; 7) Temporary services, supports, equipment and penetrations reconciled before any dock flooding activity.; 8) Only authorised dock/vessel management releases restrictions; contractor does not independently initiate flooding.

HOW TO COMPLETE AND RETAIN IT

Complete port/terminal, contractor, real work order and shift. Every original numbered hold has its own evidence reference, accepted-by field and date/signature (or designated host controller/release reference). Record HOLD/NCR/deviation and independent check or release references where provided. Stop and secure the affected task until the actual port, terminal or vessel authority issues the necessary permission; a contractor tick cannot release an operating berth or vessel system.

AUTHORITY, HOLD AND APPLICABILITY

Operator, terminal, Harbour Master and vessel Master permissions remain with the party actually controlling that activity. This Word record supports traceable contractor verification; it does not issue a port access pass, marine permit, equipment certificate or guaranteed terminal acceptance. In the complete master, Section AB remains compulsory; choose the full AC–AU annexure only when the awarded work requires this specialist trade.

TRY THIS SINGLE OR SEE THE COMPLETE AVC SYSTEM

Single editable Word form: R12.95. The 199-document Ports Checklist Package costs R1,193.95 (about R6 per form); the complete 440-page Ports Safety File is R1,899.95 and includes all 199 records, the A–AA management core, 51 compulsory AB controls and 19 full trade annexures. Read each Single's detailed technical use before choosing; offers and prices can change.

Explore all 199 Ports forms | Complete 440-page Ports Safety File

    bottom of page