AVC-PORTS-AE-H02 | Ship-Shore Power Energisation Hold Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Automatic offer on eligible individual checklists: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Browse individual checklists. Confirm the discount in your cart before checkout.
Pick 5. Pay for 4.
AVC-PORTS-AE-H02 — SHIP-SHORE POWER INTERFACE & ENERGISATION VERIFICATION
WHERE AND WHY THIS RECORD EXISTS
Use this formal HOLD/RELEASE record when the relevant port electrical systems, shore power and lighting within controlled terminal and vessel interface zones activity may not safely progress or be returned to port operations until specific evidence has been reviewed and the responsible operator has accepted it.
WHAT THE ORIGINAL FORM ACTUALLY CHECKS
HOLD POINTS PRINTED ON THIS RECORD: 1) Vessel electrical officer and shore/terminal electrical authority identified; switching responsibilities agreed.; 2) System voltage, frequency, phase sequence, capacity, protection and connection compatibility checked against approved design.; 3) All shore, vessel, generator and UPS/backfeed sources identified; signed isolation and test-before-touch evidence filed.; 4) Cable routing, shore movement allowance, mechanical protection, moisture ingress and emergency disconnection verified.; 5) Protective earthing/bonding arrangements, interlocks and automatic changeover functions independently checked.; 6) No connection, disconnection or test energisation takes place without both ship and terminal electrical authorities.; 7) Insulation, protective-device and required functional tests witnessed and test sheets attached.; 8) Switching log, changes, tags and controlled supply release accepted by the authorised operator.
HOW TO COMPLETE AND RETAIN IT
Complete port/terminal, contractor, real work order and shift. Every original numbered hold has its own evidence reference, accepted-by field and date/signature (or designated host controller/release reference). Record HOLD/NCR/deviation and independent check or release references where provided. Stop and secure the affected task until the actual port, terminal or vessel authority issues the necessary permission; a contractor tick cannot release an operating berth or vessel system.
AUTHORITY, HOLD AND APPLICABILITY
Operator, terminal, Harbour Master and vessel Master permissions remain with the party actually controlling that activity. This Word record supports traceable contractor verification; it does not issue a port access pass, marine permit, equipment certificate or guaranteed terminal acceptance. In the complete master, Section AB remains compulsory; choose the full AC–AU annexure only when the awarded work requires this specialist trade.
TRY THIS SINGLE OR SEE THE COMPLETE AVC SYSTEM
Single editable Word form: R12.95. The 199-document Ports Checklist Package costs R1,193.95 (about R6 per form); the complete 440-page Ports Safety File is R1,899.95 and includes all 199 records, the A–AA management core, 51 compulsory AB controls and 19 full trade annexures. Read each Single's detailed technical use before choosing; offers and prices can change.