The Contractor's Single-Storey Checklist Package
DON'T LET OUT-OF-LEVEL WALLING DISAPPEAR UNDER PLASTER.
A single-storey wall can look straight while its damp-proof course is broken, brickforce is missing, lintel bearing is too short or a service chase threatens a structural detail. Catch those mistakes while the masonry remains visible and repairable.
54 EDITABLE CONSTRUCTION CHECKLISTS & SITE RECORDS
54 editable documents: 30 checklists and 24 records. Topics verified from the ZIP include Walling Pre-Start, Slab and Datum Readiness, DPC/DPM at Wall Base, Masonry Quality & Brickforce, Cavity Ties and Reinforced Cores, Openings/Frames/Reveals, Movement Joints, Cavity Flashings/Weep Holes and Fire-Separation Penetration Records.
HOW TO PUT THESE FORMS TO WORK ON YOUR SITE
Give the foreman measurement and set-out checks before building, use daily walling audits and mortar/material records during production, and sign off reveals, connections, moisture details and changed conditions before plastering or roof installation.
WHY THIS PACKAGE MATTERS
Protect wall geometry, crack-control and water resistance before covering up. Track measurable workmanship and nonconformance reinspection rather than accepting an unrecorded verbal assurance. Suitable for Single-storey builders, brickwork teams, construction supervisors and general contractors managing shell-stage quality.
YOUR FULL PACKAGE OR JUST SELECTED SINGLES?
The complete 54-document ZIP is R323.95—about R6.00 per editable document. Buying 54 separate Singles at R12.95 would total R699.30; the package saves R375.35 against that comparison. All 54 forms are supplied, not only the examples above.
Browse individual Checklist Singles at R12.95 each.
INDIVIDUAL CHECKLIST PROMOTION — BUY 4, GET 1 FREE
For qualifying Singles while the offer is active, five eligible individual forms may cost the price of four. Check your cart; the promotion does not apply to this ZIP package.
A STANDALONE, EDITABLE SITE TOOLKIT
Supplied in Microsoft Word (DOCX), ready for your company to complete, sign and file. Select the forms that suit the actual work and keep the resulting evidence with the right site records. Use approved drawings, designs, competent-person inspections and client/legal requirements; these templates do not grant technical approval.

