top of page

AVC Temporary Works, Formwork, Propping, Shoring & Stability Package

R 467,95 Regular Price
R 216,95Sale Price

IF THE PROPS MOVE, THE CONCRETE POUR MUST STOP.

Starter bars can impale, a heavy reinforcing cage can overturn, formwork can move during concrete placement, and early stripping can load concrete before it is ready. The critical checks are tied to the construction sequence.

36 EDITABLE WORD FORMS SPECIFIC TO THIS WORK

36 editable temporary-works forms: 31 checklists, 2 registers, 1 scope record and 2 competency records. Drawing revisions, bearing supports, formwork, shoring towers, pre-pour release, during-pour inspections, backpropping and dismantling.

FROM THE WORKFACE TO THE SUPERVISOR'S CONTROL FILE

Keep written design-revision and formwork-release checks before a pour; log changed support loads, inspection triggers, curing and authorised stripping. Use each form or briefing for actual hazards, people and verified decisions. This is a related subsection of the trade controls, NOT an assertion that all documents in the wider full file are identical.

STANDALONE CHECKLISTS OR THE COMPLETE SAFETY FILE?

This ZIP is R216.95 for 36 documents (about R6.03 per document). Individual Singles are R12.95 each. The complete Reinforcement, Formwork & Concrete Safety File includes A–AA management plus an extensive specialist AB library. Check which forms you already own to avoid duplicate purchases.

See the complete Reinforcement, Formwork & Concrete Contractor Safety File.

Browse individual Checklist Singles (R12.95 each).

BUY 4 QUALIFYING SINGLES, GET 1 FREE

When active, the discount applies only to eligible individual Singles, not the entire ZIP. Verify any discount in your cart.

OPTIONAL BRANDING OR A READY-PRINTED SAFETY FILE

AVC can separately quote on custom-branded files, extra bespoke safety controls and printed/indexed binder assembly with delivery.

Contact AVC for custom development or a printed binder.

Editable DOCX • South Africa. Complete against the actual site, competent supervisors, approved arrangements and current legal or technical duties.

    bottom of page