AVC Structural Steel & Welding Checklists and Site Records Package
A LAST WELD CANNOT FIX A WRONG ANCHOR-BOLT SETOUT.
Steel erection brings heavy lifts, temporary bracing, anchor bolts, work at height and hot welding fumes into one job. A generic welding permit does not tell the crew whether a partially connected frame may safely stand.
93 EDITABLE TRADE WORKING FORMS
93 editable documents: 46 checklists, 31 site records and 16 toolbox talks. Base plates, anchor bolts, steel fabrication and erection sequence, lifts, bracing, weld inspection, hot work, quality evidence and controlled handover.
TRADE-SPECIFIC EVIDENCE FOR THE REAL WORKFACE
Record the lift release, temporary-bracing check and bolt/weld inspection at the correct stage before removing the crane or temporary support. This package supplies editable working records, not the full A–AA H&S management foundation.
BUY THE PACKAGE, THE COMPLETE FILE OR SELECT SINGLES
The 93-document ZIP is R557.95 (approximately R6.00 each) versus R12.95 per Single. The full Structural Steel Erection & Welding Safety File includes A–AA and purpose-developed AB specialist controls. Avoid buying documents you already own.
View the full Structural Steel Erection & Welding Contractor Safety File.
Browse individual Checklist Singles at R12.95 each.
ELIGIBLE INDIVIDUAL SINGLES: BUY 4, GET 1 FREE
When active, the discount applies to qualifying Singles, not this full ZIP. Check the offer in your cart before payment.
BRANDING, CUSTOM DOCUMENTS OR PROFESSIONAL PRINTING
Ask AVC for a separate quotation for tailored, company-branded or printed/indexed lever-arch Safety Files.
Contact AVC for a customised or printed Safety File.
Digital editable Word files • South Africa. Complete each record for actual hazards, approved arrangements, equipment and competent-person checks.

