97 - AE-T01 | Underground Refrigeration & Cooling Inspection Test Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AE-T01 — UNDERGROUND REFRIGERATION & COOLING INSPECTION TEST RECORD
Seven genuine mine refrigeration/mechanical test evidence rows verify asset and ventilation permission, pressure/refrigerant recovery, lifting/condensate safeguards, leak testing, fan/cooling interlocks, duct/fire damper/airflow and host mine ventilation-engineer handback.
MINE REFRIGERATION SOURCE WORK APPLICATION
Use at technical inspection, pressure/leak testing and handover of underground coolers, mechanical plant, refrigerant systems and duct interfaces. Enter Underground mine / site, Contractor, Item / system / asset ID, Work order, Drawing / revision and Activity date.
SEVEN SOURCE MECHANICAL AND COOLING TEST ITEMS
1. System ID and mine ventilation clearance
2. Isolation, pressure and refrigerant inventory/recovery
3. Lifting/placement and drip containment check
4. Leak/tightness and pressure test evidence
5. Fan/cooling/control/interlock functional results
6. Condensate, duct fire damper and air flow interface
7. Mine engineer/ventilation responsible person handback
HOW TO FILL IN THE ACTUAL WORD FIELDS
For all seven TEST / COMPLETION RECORD items fill true RESULT / MEASUREMENT and SOURCE / SIGN-OFF. Keep gas/oxygen readings, inventory/recovery records, pressure test result, calibrated functional control checks, ventilation baseline and operator release.
STOP-WORK, OXYGEN DISPLACEMENT AND MINE RELEASE
Original CONDITION OF HANDOVER rejects blanks as proof and bars affected plant return to service without actual operator-approved close-out. Contractor tests do not authorise mine ventilation changes.
TECHNICAL EVIDENCE AND VENTILATION AUTHORITY
Record actual mine refrigerant classification, isolation permit, gas/oxygen test, ventilation baseline, temporary cooling and heat-stress arrangements, rigging approvals, refrigerant recovery, commissioned alarms and responsible mine official sign-off. The editable source file records controls already approved; it cannot override statutory mine ventilation or critical service management.
ONE SOURCE ORIGINAL OR FULL UNDERGROUND COLLECTION
This R12.95 AE-T01 Word source is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing collection owners should avoid buying it twice. Mine ventilation, mechanical engineering and emergency officials must authorise affected equipment release.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

