top of page

97 - AE-T01 | Underground Refrigeration & Cooling Inspection Test Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95

AE-T01 — UNDERGROUND REFRIGERATION & COOLING INSPECTION TEST RECORD

Seven genuine mine refrigeration/mechanical test evidence rows verify asset and ventilation permission, pressure/refrigerant recovery, lifting/condensate safeguards, leak testing, fan/cooling interlocks, duct/fire damper/airflow and host mine ventilation-engineer handback.

MINE REFRIGERATION SOURCE WORK APPLICATION

Use at technical inspection, pressure/leak testing and handover of underground coolers, mechanical plant, refrigerant systems and duct interfaces. Enter Underground mine / site, Contractor, Item / system / asset ID, Work order, Drawing / revision and Activity date.

SEVEN SOURCE MECHANICAL AND COOLING TEST ITEMS

1. System ID and mine ventilation clearance

2. Isolation, pressure and refrigerant inventory/recovery

3. Lifting/placement and drip containment check

4. Leak/tightness and pressure test evidence

5. Fan/cooling/control/interlock functional results

6. Condensate, duct fire damper and air flow interface

7. Mine engineer/ventilation responsible person handback

HOW TO FILL IN THE ACTUAL WORD FIELDS

For all seven TEST / COMPLETION RECORD items fill true RESULT / MEASUREMENT and SOURCE / SIGN-OFF. Keep gas/oxygen readings, inventory/recovery records, pressure test result, calibrated functional control checks, ventilation baseline and operator release.

STOP-WORK, OXYGEN DISPLACEMENT AND MINE RELEASE

Original CONDITION OF HANDOVER rejects blanks as proof and bars affected plant return to service without actual operator-approved close-out. Contractor tests do not authorise mine ventilation changes.

TECHNICAL EVIDENCE AND VENTILATION AUTHORITY

Record actual mine refrigerant classification, isolation permit, gas/oxygen test, ventilation baseline, temporary cooling and heat-stress arrangements, rigging approvals, refrigerant recovery, commissioned alarms and responsible mine official sign-off. The editable source file records controls already approved; it cannot override statutory mine ventilation or critical service management.

ONE SOURCE ORIGINAL OR FULL UNDERGROUND COLLECTION

This R12.95 AE-T01 Word source is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing collection owners should avoid buying it twice. Mine ventilation, mechanical engineering and emergency officials must authorise affected equipment release.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page