95 - AE-R03 | Cooling Inspection & Technical Evidence Register
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AE-R03 — COOLING INSPECTION & TECHNICAL EVIDENCE REGISTER
Seven genuine underground cooling inspection/evidence checks begin with refrigeration plant tagging and all fluid/pressure sources and end with the measured heat-stress consequences of temporary lost cooling.
MINE REFRIGERATION ORIGINAL APPLICATION
Use for mine cooling equipment, pressurised refrigeration, rotating plant and ventilation cooling work. Fill MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.
SEVEN SOURCE MECHANICAL AND COOLING EVIDENCE ITEMS
1. Plant tag, location and all connected fluids/pressure/energy sources identified
2. Cooling/refrigerant work checked for asphyxiation, leakage and ventilation consequences
3. Hydraulic, pneumatic, steam, water, mechanical and electrical isolation proved
4. Lifting routes and roof-support anchor loads approved by mine responsible person
5. Rotating guards, coupling alignment and vibration baseline inspected
6. Drains, relief devices and refrigerant recovery arrangements verified
7. Temporary loss of cooling evaluated for worker heat stress and adjacent mine areas
FILL THE REAL PRINTED WORD SOURCE
Document seven real source MINING-SPECIFIC ITEM / EVIDENCE TO TRACK entries with measured results and date/authority/status. Retain equipment tag, gas monitoring, refrigeration recovery, lifting route, shaft support approval, relief devices and mechanical vibration checks.
STOP-WORK AND MINE VENTILATION / PLANT RELEASE
The original demands traceable genuine results and an outstanding defect/NCR/reinspection/retention reference plus contractor and mine authority review. A completed log never grants permission to change statutory ventilation.
EVIDENCE AND OPERATOR-OWNED VENTILATION CONTROLS
Retain plant tag, refrigerant recovery, actual gas/oxygen and pressure test readings, multi-energy isolation, lift support, vibration checks, heat-stress effects and mine technical acceptance. This editable original Word is an evidence record only; no contractor can independently alter mine airflow or accept a critical cooling system.
BUY THE SINGLE OR COMPLETE UNDERGROUND COLLECTION