top of page

94 - AE-R02 | Cooling Defects & Corrective Action Log

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AE-R02 — COOLING DEFECTS & CORRECTIVE ACTION LOG

Original five-column OPEN-ENTRY underground mechanical, refrigeration and cooling defect/inspection/corrective-action log. It has no seven preset technical points; actual unsafe pressure, leak, vibration, condensate and heat-stress defects are recorded by the user.

MINE REFRIGERATION ORIGINAL APPLICATION

Use after mine refrigeration inspection, leak alarms, failed pressure or ventilation interfaces, inadequately supported plant or cooling outages. Enter Underground mine / site, Company, Contract / work order and Responsible person.

FIVE ORIGINAL OPEN-ENTRY LOG COLUMNS

ITEM / LOCATION

DEFECT / CONTROL

OWNER / TARGET

ACTION / EVIDENCE

ACCEPTED / CLOSED

FILL THE REAL PRINTED WORD SOURCE

Use the five printed headings ITEM / LOCATION, DEFECT / CONTROL, OWNER / TARGET, ACTION / EVIDENCE and ACCEPTED / CLOSED. Identify the plant and mine level, immediate containment, repair owner/deadline, pressure or gas test results and mine close-out evidence.

STOP-WORK AND MINE VENTILATION / PLANT RELEASE

The genuine CONTROL clause requires updated records whenever scope, personnel, plant, authority or hazards change. High-consequence defects stay on HOLD until mine technical acceptance; an open fault is not closed by a contractor signature alone.

EVIDENCE AND OPERATOR-OWNED VENTILATION CONTROLS

Retain plant tag, refrigerant recovery, actual gas/oxygen and pressure test readings, multi-energy isolation, lift support, vibration checks, heat-stress effects and mine technical acceptance. This editable original Word is an evidence record only; no contractor can independently alter mine airflow or accept a critical cooling system.

BUY THE SINGLE OR COMPLETE UNDERGROUND COLLECTION

This R12.95 AE-R02 Word source is already included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing package owners should avoid duplicate purchases. Mine ventilation, engineering and plant work release remains mandatory.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page