92 - AE-H02 | Cooling Witness Hold & Mine Return-to-Service Gate

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AE-H02 — COOLING WITNESS HOLD & MINE RETURN-TO-SERVICE GATE

Five original independently witnessed mine cooling hold gates cover identified plant and connected fluids, refrigerant/asphyxiation consequences, multi-energy isolation, approved underground lifting support and safe guards/coupling/vibration.

MINE REFRIGERATION ORIGINAL APPLICATION

Use at mine-controlled refrigerant, mechanical plant or cooling service hold and return-to-service stages. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.

FIVE INDEPENDENT MINE COOLING WITNESS GATES

1. Plant tag, location and all connected fluids/pressure/energy sources identified

2. Cooling/refrigerant work checked for asphyxiation, leakage and ventilation consequences

3. Hydraulic, pneumatic, steam, water, mechanical and electrical isolation proved

4. Lifting routes and roof-support anchor loads approved by mine responsible person

5. Rotating guards, coupling alignment and vibration baseline inspected

FILL THE REAL PRINTED WORD SOURCE

Fill five HOLD TRIGGER / EVIDENCE GATE items with real REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. Attach equipment tag, leak/gas monitor, isolation, approved rigging and witnessed mechanical guard checks.

STOP-WORK AND MINE VENTILATION / PLANT RELEASE

The printed RELEASE CONDITION requires applicable gates PASS, evidence linked to the approved mine work order and corrected/witnessed defects. Only the named authorised mine representative grants plant or area release.

EVIDENCE AND OPERATOR-OWNED VENTILATION CONTROLS

Retain plant tag, refrigerant recovery, actual gas/oxygen and pressure test readings, multi-energy isolation, lift support, vibration checks, heat-stress effects and mine technical acceptance. This editable original Word is an evidence record only; no contractor can independently alter mine airflow or accept a critical cooling system.

BUY THE SINGLE OR COMPLETE UNDERGROUND COLLECTION

This R12.95 AE-H02 Word source is already included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing package owners should avoid duplicate purchases. Mine ventilation, engineering and plant work release remains mandatory.