92 - AE-H02 | Cooling Witness Hold & Mine Return-to-Service Gate
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AE-H02 — COOLING WITNESS HOLD & MINE RETURN-TO-SERVICE GATE
Five original independently witnessed mine cooling hold gates cover identified plant and connected fluids, refrigerant/asphyxiation consequences, multi-energy isolation, approved underground lifting support and safe guards/coupling/vibration.
MINE REFRIGERATION ORIGINAL APPLICATION
Use at mine-controlled refrigerant, mechanical plant or cooling service hold and return-to-service stages. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.
FIVE INDEPENDENT MINE COOLING WITNESS GATES
1. Plant tag, location and all connected fluids/pressure/energy sources identified
2. Cooling/refrigerant work checked for asphyxiation, leakage and ventilation consequences
3. Hydraulic, pneumatic, steam, water, mechanical and electrical isolation proved
4. Lifting routes and roof-support anchor loads approved by mine responsible person
5. Rotating guards, coupling alignment and vibration baseline inspected
FILL THE REAL PRINTED WORD SOURCE
Fill five HOLD TRIGGER / EVIDENCE GATE items with real REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. Attach equipment tag, leak/gas monitor, isolation, approved rigging and witnessed mechanical guard checks.
STOP-WORK AND MINE VENTILATION / PLANT RELEASE
The printed RELEASE CONDITION requires applicable gates PASS, evidence linked to the approved mine work order and corrected/witnessed defects. Only the named authorised mine representative grants plant or area release.
EVIDENCE AND OPERATOR-OWNED VENTILATION CONTROLS
Retain plant tag, refrigerant recovery, actual gas/oxygen and pressure test readings, multi-energy isolation, lift support, vibration checks, heat-stress effects and mine technical acceptance. This editable original Word is an evidence record only; no contractor can independently alter mine airflow or accept a critical cooling system.
BUY THE SINGLE OR COMPLETE UNDERGROUND COLLECTION
This R12.95 AE-H02 Word source is already included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing package owners should avoid duplicate purchases. Mine ventilation, engineering and plant work release remains mandatory.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

