top of page

91 - AE-F01 | Cooling Hold, Release & Mine Plant Handover Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AE-F01 — COOLING HOLD, RELEASE & MINE PLANT HANDOVER RECORD

Five mine-owned cooling hold/release stages address thermal/ventilation screening, atmosphere and energy isolation, refrigerant recovery/containment, pressure/leak proving and mine plant handback.

ORIGINAL MINE COOLING APPLICATION

Use before each critical mine refrigeration work stage. Complete Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner.

FIVE SOURCE COOLING HOLD/RELEASE STAGES

1. Ventilation and thermal-system impact screening

2. Area atmosphere and multidomain energy isolation

3. Refrigerant cylinder/recovery and pressure containment release

4. Pressure, leak and functional test window authorisation

5. Critical cooling/ventilation interface sign-off and handback

SOURCE WORD EVIDENCE COMPLETION

Enter Hold, Release or N/A for five original STEP / HOLD / STOP POINT rows, with actual VERIFIER / RECORD evidence, time and signatures. Keep atmosphere checks, recovery logs, pressure tests and mine handover.

MINE AIRFLOW AND PLANT RELEASE

Original NO RELEASE IF rule blocks progression without mine permit, independent witnessed hold or operator acceptance. Contractor and mine signatures are separate.

TRACEABLE MINE VENTILATION EVIDENCE

Retain work permit, ventilation baseline, oxygen/pressure checks, refrigerant recovery, isolation, thermal impact and responsible mine engineer acceptance. This editable Word form never grants authority over statutory ventilation or mine life-support plant.

INDIVIDUAL SOURCE OR COMPLETE MINE FILE

This R12.95 AE-F01 Word original is in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing collection owners should not repurchase. Operator-owned ventilation, cooling and mine engineering permissions are mandatory.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page