91 - AD-TB-02 | Apron Excavation & Buried Services Toolbox Talk
Buy 4 Checklists, Get 1 Free
SPECIALIST AIRFIELD CIVIL PURPOSE
The original AD-TB-02 Apron Excavation & Buried Services Toolbox Talk is a specialist AVC toolbox talk for real runway, taxiway, apron and other airfield civil work. Pavement repairs and excavations can interfere with aircraft movements; debris, temporary work areas, buried services, insufficient repairs and rushed work windows require documented safeguards. It is a source-original editable Word document, not a generic site-wide work permit.
WHEN TO USE THE ORIGINAL
Identify exact airfield area, actual work order, shift, aircraft operating window, qualified workers and authorised airport custodian. Before work, check access and operational notifications, movement-area boundaries, vehicle escorts, buried service plans, equipment separation, suitable pavement materials and how FOD will be contained. Record the relevant control in the genuine Word fields.
REAL PRINTED SOURCE CHECKS
This original Word prints 5 specific crew discussion points: • Use airport-authorised service drawings and scan before digging. • Treat buried power, fuel and communication services as live until verified. • Fence the excavation against aircraft vehicles and passenger buses. • Keep spoil and aggregate out of aircraft engine hazard zones. • Get signed backfill, test and FOD acceptance before removing barriers.
TEST, HOLD AND SIGNATURE EVIDENCE
Exactly SIXTEEN attendance signature rows record real briefing participation and date/shift, with outstanding safety matters, without purporting to release a runway.
AIRPORT OPERATING AUTHORITY
The airport civil and operations custodian controls workfront closure and reopening, including any ATC coordination and verification of airside visibility, pavement stability and site clearance. The contractor must physically reconcile tools, fasteners and debris and carry unresolved buried service, pavement or FOD risks into the next shift. Never declare an unperformed test passed.
WORKFRONT DEFECTS AND HANDOVER
The airport civil and operations custodian controls workfront closure and reopening, including any ATC coordination and verification of airside visibility, pavement stability and site clearance. The contractor must physically reconcile tools, fasteners and debris and carry unresolved buried service, pavement or FOD risks into the next shift. Never declare an unperformed test passed.
SOURCE ORIGINAL WORD AND FULL AVC FILE
This exact source-identical editable AVC Word costs R12.95 separately, but is already included in the full 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor H&S File. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the applicable automatic cart promotion applies: five pay for four, ten for eight, fifteen for twelve. Confirm checkout; full packages excluded.

