top of page

90 - AD-TB-01 | Runway Repair Work Windows Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

SPECIALIST AIRFIELD CIVIL PURPOSE

The original AD-TB-01 Runway Repair Work Windows Toolbox Talk is a specialist AVC toolbox talk for real runway, taxiway, apron and other airfield civil work. Pavement repairs and excavations can interfere with aircraft movements; debris, temporary work areas, buried services, insufficient repairs and rushed work windows require documented safeguards. It is a source-original editable Word document, not a generic site-wide work permit.

WHEN TO USE THE ORIGINAL

Identify exact airfield area, actual work order, shift, aircraft operating window, qualified workers and authorised airport custodian. Before work, check access and operational notifications, movement-area boundaries, vehicle escorts, buried service plans, equipment separation, suitable pavement materials and how FOD will be contained. Record the relevant control in the genuine Word fields.

REAL PRINTED SOURCE CHECKS

This original Word prints 5 specific crew discussion points: • Do not enter a movement area until authorised by the airport control system. • Check work-window end time and escape route before placing equipment. • Contain every fragment of sawcut, concrete and hardware. • Maintain clearance from lights, signs and pavement markings. • Only the operator can release the area back to aircraft use.

TEST, HOLD AND SIGNATURE EVIDENCE

Exactly SIXTEEN attendance signature rows record real briefing participation and date/shift, with outstanding safety matters, without purporting to release a runway.

AIRPORT OPERATING AUTHORITY

The airport civil and operations custodian controls workfront closure and reopening, including any ATC coordination and verification of airside visibility, pavement stability and site clearance. The contractor must physically reconcile tools, fasteners and debris and carry unresolved buried service, pavement or FOD risks into the next shift. Never declare an unperformed test passed.

WORKFRONT DEFECTS AND HANDOVER

The airport civil and operations custodian controls workfront closure and reopening, including any ATC coordination and verification of airside visibility, pavement stability and site clearance. The contractor must physically reconcile tools, fasteners and debris and carry unresolved buried service, pavement or FOD risks into the next shift. Never declare an unperformed test passed.

SOURCE ORIGINAL WORD AND FULL AVC FILE

This exact source-identical editable AVC Word costs R12.95 separately, but is already included in the full 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor H&S File. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the applicable automatic cart promotion applies: five pay for four, ten for eight, fifteen for twelve. Confirm checkout; full packages excluded.

Browse AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Contractor H&S File

    bottom of page