top of page

88 - AE-C01 | Cooling Ten-Point Task Readiness & Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AE-C01 — COOLING TEN-POINT TASK READINESS & PRESTART CHECKLIST

TEN true mine refrigeration prestart controls include statutory ventilation boundaries, airflow impact, atmosphere, all-system isolation, refrigerant/cylinder risk, fire permits, heavy lifting, condensate, fan alarms and mine release.

ORIGINAL MINE COOLING APPLICATION

Use before approved underground cooling work. Fill mine/site, company, zone, shift, work order and supervisor.

TEN ORIGINAL MINE COOLING PRESTART POINTS

1. The actual plant is distinguished from statutory mine ventilation and emergency refuge services.

2. Mine ventilation department has reviewed impacts on air quantity, airflow direction and contaminants.

3. Area gases, temperature, noise and air quality within host limits before work.

4. Electrical, mechanical, pressure, hydraulic and refrigerant isolation verified.

5. Refrigerant cylinders, leak detection, ventilation and ignition limits assessed for the mine zone.

6. Flammable refrigerants/gases and hot-work sources subject to mine-specific permits.

7. Lifts, rigging and transported heavy equipment approved for conveyances and route restrictions.

8. Drainage/condensate discharge does not create electrical or slip hazards or pollute mine water.

9. Fan, cooling, control alarms and protective devices tested against authorised standards.

10. Mine ventilation/engineering owner approves restoration with any safe operating limitations.

SOURCE WORD EVIDENCE COMPLETION

Mark YES/NO/N/A and EVIDENCE / ACTION for ten original RELEASE / VERIFICATION POINT items. File actual mine approvals.

MINE AIRFLOW AND PLANT RELEASE

Original RELEASE RULE requires separate CONTRACTOR CHECK and MINE / HOST RELEASE. Never change ventilation without operator authority.

TRACEABLE MINE VENTILATION EVIDENCE

Retain work permit, ventilation baseline, oxygen/pressure checks, refrigerant recovery, isolation, thermal impact and responsible mine engineer acceptance. This editable Word form never grants authority over statutory ventilation or mine life-support plant.

INDIVIDUAL SOURCE OR COMPLETE MINE FILE

This R12.95 AE-C01 Word original is in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing collection owners should not repurchase. Operator-owned ventilation, cooling and mine engineering permissions are mandatory.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page