85 - AD-C00 | Airfield Civil Contract Annexure Activation
Buy 4 Checklists, Get 1 Free
SPECIALIST AIRFIELD CIVIL PURPOSE
The original AD-C00 Airfield Civil Contract Annexure Activation is a specialist AVC inspection and approval record for real runway, taxiway, apron and other airfield civil work. Pavement repairs and excavations can interfere with aircraft movements; debris, temporary work areas, buried services, insufficient repairs and rushed work windows require documented safeguards. It is a source-original editable Word document, not a generic site-wide work permit.
WHEN TO USE THE ORIGINAL
Identify exact airfield area, actual work order, shift, aircraft operating window, qualified workers and authorised airport custodian. Before work, check access and operational notifications, movement-area boundaries, vehicle escorts, buried service plans, equipment separation, suitable pavement materials and how FOD will be contained. Record the relevant control in the genuine Word fields.
REAL PRINTED SOURCE CHECKS
This original Word prints 8 numbered YES/NO/N/A or HOLD acceptance controls: 1. Approved contract scope, work order and actual airport area identified 2. Runway/taxiway area closure and operator authorisation obtained 3. ATC/airport operations sequence and communication agreed 4. Height/obstacle limits and vehicle escort arranged 5. Buried fuel, power, comms and lighting located before excavation 6. Concrete/asphalt debris and FOD barriers effective 7. Work-zone access, trade permit and operating window documented 8. Airport area/system owner and contractor supervisor jointly accept start
TEST, HOLD AND SIGNATURE EVIDENCE
Each printed check requires actual status, supporting evidence or defect and a named person to close corrective actions. Contractor signoff does not automatically reopen an airport operating area.
AIRPORT OPERATING AUTHORITY
The airport civil and operations custodian controls workfront closure and reopening, including any ATC coordination and verification of airside visibility, pavement stability and site clearance. The contractor must physically reconcile tools, fasteners and debris and carry unresolved buried service, pavement or FOD risks into the next shift. Never declare an unperformed test passed.
SOURCE ORIGINAL WORD AND FULL AVC FILE
This exact source-identical editable AVC Word costs R12.95 separately, but is already included in the full 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor H&S File. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the applicable automatic cart promotion applies: five pay for four, ten for eight, fifteen for twelve. Confirm checkout; full packages excluded.

