top of page

84 - AD-TT02 | Unexpected Energisation & Remote-Start Prevention Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95

AD-TT02 — UNEXPECTED ENERGISATION & REMOTE-START PREVENTION TALK

Five authentic original toolbox controls support remote-start and unexpected-energisation prevention through certified flameproof/IS components, no unauthorised critical mine system change, zone-approved test tools, cable/earthing/protection checks and verified explosion protection before recommissioning.

MINE ELECTRICAL SOURCE WORK APPLICATION

Use before underground instruments, cables, remote controls, protection or electrical plant testing. Fill Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref under the mine switching authority.

FIVE ORIGINAL HAZARDOUS ELECTRICAL SAFETY ITEMS

1. Flameproof/intrinsic-safety integrity and approved components maintained where required.

2. No electrical change is made to critical ventilation, winding, dewatering, fire or communications systems without impact consent.

3. Tools and test equipment approved/calibrated for mine zone; portable units checked.

4. Cables/earthing, glands, protection, alarms and temperature ratings inspected before test.

5. Verify intrinsic safety or explosion-protection status before restoring instruments in any classified mine location.

COMPLETING ACTUAL PRINTED WORD FIELDS

Brief the source's five printed controls—retain apparatus ratings, ventilation/dewatering/fire-system impact consent, calibration and approval of test tools, cable entry/gland/earthing/alarms checks and the final IS/explosion-proof status. Record worker signatures.

MINE SWITCHING, GAS AND REMOTE-START STOP WORK

STOP where the switching authority is absent, feeds are unidentifiable, methane/dust status is unsafe or a critical mine protection is altered. This source talk does not itself issue an energisation permit.

ELECTRICAL PERMISSIONS AND TECHNICAL EVIDENCE

Keep mine single-line revision, appointed switching instructions, lockout/earth/test-before-touch, hazardous-area rating, UPS/DC/backfeed analysis and functional alarm/trip test results. The Word original is evidence only; mine electrical and protection owners control energisation, critical logic changes and return to service.

ONE SOURCE ORIGINAL OR COMPLETE MINE COLLECTION

This R12.95 AD-TT02 Word Single is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid duplicate purchase. Mine-owned switchgear, hazardous-zone and safety-system permissions remain essential.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page