AD-T01 — MINE ELECTRICAL & CONTROL SYSTEMS INSPECTION TEST RECORD
The original seven-row mine electrical inspection/test record captures approved single-line and lockout references, test instrument calibration, flameproof/IS entry integrity, earth and insulation readings, trip/stop/alarm tests, SCADA remote-start re-commissioning and mine electrical authority handback.
MINE ELECTRICAL SOURCE WORK APPLICATION
Use for mine-authorised switchgear, instrument circuits, protection and remote control systems after inspection or repair. Enter Underground mine / site, Contractor, Item / system / asset ID, Work order, Drawing / revision and Activity date.
SEVEN ORIGINAL ELECTRICAL INSPECTION TEST ITEMS
1. Isolation tag numbers and approved single-line drawing
2. Competence and calibrated electrical test instrument refs
3. Flameproof/IS apparatus and cable-entry integrity checks
4. Earth/bonding and insulation measurement results
5. Trip, protection, emergency stop and alarm tests
6. SCADA/remote start inhibition and recommissioning record
7. Mine electrical authority signed handback
COMPLETING ACTUAL PRINTED WORD FIELDS
For seven TEST / COMPLETION RECORD rows record actual RESULT / MEASUREMENT and SOURCE / SIGN-OFF. File switching permit, calibrated instrument IDs, insulation/bonding results, mine protection and alarm test outcomes and receiving mine official acceptance.
MINE SWITCHING, GAS AND REMOTE-START STOP WORK
The original rejects blank measurements as evidence. An unresolved protection defect, unverified remote start or missing mine switching approval prevents affected equipment return to service.
ELECTRICAL PERMISSIONS AND TECHNICAL EVIDENCE
Keep mine single-line revision, appointed switching instructions, lockout/earth/test-before-touch, hazardous-area rating, UPS/DC/backfeed analysis and functional alarm/trip test results. The Word original is evidence only; mine electrical and protection owners control energisation, critical logic changes and return to service.
ONE SOURCE ORIGINAL OR COMPLETE MINE COLLECTION
This R12.95 AD-T01 Word Single is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid duplicate purchase. Mine-owned switchgear, hazardous-zone and safety-system permissions remain essential.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles