top of page

8 - AB-06-C01 | Mine Hazard & Simultaneous Operations Coordination

R 12,95Price

Buy 4 Checklists, Get 1 Free

OPENCAST MINING SINGLES OFFER: This authentic editable Word document costs R12.95. Buy five qualifying Singles for the price of four, ten for eight, or fifteen for twelve while the promotion applies. Check the cart.

AB-06-C01 — MINE HAZARD & SIMULTANEOUS OPERATIONS COORDINATION

Your company has won work inside a live mine. Mine Hazard & Simultaneous Operations Coordination cannot be controlled using another firm's unrelated forms. This original AVC Section AB Word record

10 SOURCE-ORIGINAL YES / NO / N/A POINTS

1. Mine owner baseline hazard information and adjacent work exposures received.

2. Blasting schedule, warning, exclusion and all-clear checked.

3. Changes to haul roads / TMM paths communicated to crew.

4. Pit/bench/edge/stockpile stability reviewed by competent mine authority.

5. Conveyor/process plant hazards and production handovers verified.

6. Dust, silica, noise, heat, weather and exposure alerts briefed.

7. Electrical, pressure, gas, chemical and stored-energy work conflicts coordinated.

8. Adjacent work, crane radius, suspended loads and work-at-height segregation recorded.

9. Right to refuse/withdraw from dangerous work reinforced.

10. Every material change triggers re-brief, additional permit and re-release.

EXACT PRINTED FORM AND PRACTICAL USE

The printed document has 10 verification rows, each with YES / NO / N/A and EVIDENCE / ACTION, plus the actual mine, site, contractor, area/zone, shift, scope and supervisor. Contractor and HOST MINE release signatories are separate. Explain N/A and record evidence for all critical checks.

WHEN TO STOP, WITHDRAW OR REQUEST A SITE REVIEW

The original RELEASE RULE requires stopping for any NO against a critical risk, escalating it and recording the correction and new mine-owned authorisation. Contractor signatures never replace the mine's permits or operational instructions.

COMPLETE THE WORD ORIGINAL FOR YOUR OWN SITE

Add your company's real work order, affected zone, shift, personnel, mine-controlled permits, inspection or verification references and required signatures. Retain supporting evidence and changed-condition records with the actual contractor work package.

ONE ORIGINAL OR THE COMPLETE CONTRACTOR SYSTEM

This R12.95 AB-06-C01 source-original Word document is ALREADY INCLUDED in the 386-document Surface, Opencast & Quarry Mining Checklist Package and inside the full Surface Mining Contractor Health & Safety File. Don't buy it twice if you own a larger set. The full file includes the contractor management framework and relevant trade annexures.

Browse AVC Safety Checklist Singles.

Compare the 386-document Surface Mining Checklist Package.

View the complete Surface Mining Contractor Safety File.

IMPORTANT: These are editable source documents, not statutory permits, mine-approved COPs, safety accreditation or automatic access to work at a mine. Always apply site law, work permissions and competent mine review.

    bottom of page