top of page

78 - AD-R01 | Electrical Competency, Permits & Equipment Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95

AD-R01 — ELECTRICAL COMPETENCY, PERMITS & EQUIPMENT REGISTER

Original five-column OPEN-ENTRY mine electrical competency and permit evidence register. The source explicitly states it DOES NOT itself confer mine electrical switching or plant authority.

ORIGINAL MINE ELECTRICAL WORK SCOPE

Use before mine HV/LV electrical, relay calibration, cable or hazardous-area work. Enter Underground mine / site, Company, Contract / work order and Responsible person. Verify the area/feeder work authority.

FIVE ORIGINAL OPEN-ENTRY SOURCE COLUMNS

PERSON / ROLE

LICENCE / COMPETENCY

PLANT / PERMIT ID

EXPIRY / RESTRICTION

MINE AUTHORISATION

COMPLETING REAL PRINTED WORD EVIDENCE

Fill original PERSON / ROLE, LICENCE / COMPETENCY, PLANT / PERMIT ID, EXPIRY / RESTRICTION and MINE AUTHORISATION fields. Match named worker, mine-appointed issuer, zone equipment rating, authorised voltage class and permit expiry.

MINE ELECTRICAL STOP-WORK AND SWITCHING

The source requires reassessment when mine hazards, personnel, permits or scope change. A permit entry does not entitle a worker to perform electrical switching or test live systems.

TECHNICAL PERMIT RESTRICTIONS AND EVIDENCE

Attach actual switching schedule, single-line revision, earthing/proof-of-dead, DC/UPS/VSD backfeed, IS/flameproof classification, calibrated tests and mine owner acceptance. This editable source Word documents authorised work but does not create electrical switching permission, modify safety logic or authorise re-energisation.

BUY THIS SINGLE OR THE COMPLETE MINE FILE

The R12.95 AD-R01 original is already part of the full 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid duplicate purchases. Mine-appointed electrical, control-system and protection duty holders govern all service release and switching.

THREE LIVE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page