top of page

76 - AD-F01 | Electrical Hold, Release & Mine Handover Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AD-F01 — ELECTRICAL HOLD, RELEASE & MINE HANDOVER RECORD

Underground electrical hold/release and handover. This five-stage controlled record separates contractor evidence from the host-mine electrical owner's system release.

WHERE THIS SOURCE WORKPACK IS USED

Use before each critical electrical work stage: hazardous area clearance, isolation, flameproof equipment acceptance, controlled energisation and safety interlock return-to-service.

FIVE ACTUAL MINE ELECTRICAL HOLD POINTS

1. Electrical area and hazardous-classification release

2. Positive isolation, proof of dead and stored-energy release

3. Flameproof/IS equipment and critical-system acceptance

4. Controlled test/energisation window and exclusion

5. Protection/interlock results and electrical engineer return-to-service

COMPLETING THE PRINTED ORIGINAL WORD

Record the printed HOLD / STOP POINT, Hold / Release / N/A status, VERIFIER / RECORD, time and signatures. Maintain the FINAL CONTRACTOR ACCEPTANCE and HOST-MINE RELEASE separately.

MINE ELECTRICAL AUTHORITY AND STOP-WORK TRIGGER

NO RELEASE IF mine permits, technical holds or authorised host-mine acceptance are missing. Never treat this contractor record as an electrical switching instruction.

ESSENTIAL WORK ORDER AND TEST EVIDENCE

Use the actual mine area and asset identifiers, authorised switching schedule, feeder single-line revision, proof-of-dead and earthing evidence, UPS or VSD backfeed analysis, hazardous-area classification, mine gas/fire/communications interfaces and receiving official. Technical measurements, protection interlock results, competent signatures, and open defects must be traceable.

BUY ONE EDITABLE SOURCE ORIGINAL OR A COMPLETE MINE FILE

This R12.95 AD-F01 original Word document is included in the 371-document Underground Mining Checklist Package and in the 628-page Contractor Health and Safety File. Existing collection owners should avoid duplicate purchases. The mine's own appointments, isolation permissions, safe electrical switching and engineering acceptance remain mandatory.

THREE CLICKABLE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page