76 - AD-F01 | Electrical Hold, Release & Mine Handover Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AD-F01 — ELECTRICAL HOLD, RELEASE & MINE HANDOVER RECORD
Underground electrical hold/release and handover. This five-stage controlled record separates contractor evidence from the host-mine electrical owner's system release.
WHERE THIS SOURCE WORKPACK IS USED
Use before each critical electrical work stage: hazardous area clearance, isolation, flameproof equipment acceptance, controlled energisation and safety interlock return-to-service.
FIVE ACTUAL MINE ELECTRICAL HOLD POINTS
1. Electrical area and hazardous-classification release
2. Positive isolation, proof of dead and stored-energy release
3. Flameproof/IS equipment and critical-system acceptance
4. Controlled test/energisation window and exclusion
5. Protection/interlock results and electrical engineer return-to-service
COMPLETING THE PRINTED ORIGINAL WORD
Record the printed HOLD / STOP POINT, Hold / Release / N/A status, VERIFIER / RECORD, time and signatures. Maintain the FINAL CONTRACTOR ACCEPTANCE and HOST-MINE RELEASE separately.
MINE ELECTRICAL AUTHORITY AND STOP-WORK TRIGGER
NO RELEASE IF mine permits, technical holds or authorised host-mine acceptance are missing. Never treat this contractor record as an electrical switching instruction.
ESSENTIAL WORK ORDER AND TEST EVIDENCE
Use the actual mine area and asset identifiers, authorised switching schedule, feeder single-line revision, proof-of-dead and earthing evidence, UPS or VSD backfeed analysis, hazardous-area classification, mine gas/fire/communications interfaces and receiving official. Technical measurements, protection interlock results, competent signatures, and open defects must be traceable.
BUY ONE EDITABLE SOURCE ORIGINAL OR A COMPLETE MINE FILE
This R12.95 AD-F01 original Word document is included in the 371-document Underground Mining Checklist Package and in the 628-page Contractor Health and Safety File. Existing collection owners should avoid duplicate purchases. The mine's own appointments, isolation permissions, safe electrical switching and engineering acceptance remain mandatory.
THREE CLICKABLE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

