top of page

74 - AD-C02 | Electrical Underground Shift & Area Readiness Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AD-C02 — ELECTRICAL UNDERGROUND SHIFT & AREA READINESS CHECKLIST

Seven original mine electrical shift and area checks verify the feeder against live single-line drawings, mine switching, UPS/VSD/remote-start sources, explosion protection, alarm dependencies and reinstated cable barriers.

WHERE THIS SOURCE WORKPACK IS USED

Use at each underground electrical, automation or instrumentation shift change or whenever the mine work order, permit, protection or equipment configuration changes.

SEVEN ACTUAL MINE ELECTRICAL SAFETY CHECKS

1. Electrical asset and feeder positively identified against live mine single-line diagrams

2. Mine switching authority issues and records isolation, earthing and proof-of-dead

3. Backfeed, UPS, generator, battery, VSD and remote-start sources assessed

4. Flameproof or intrinsically safe apparatus selection matches declared mine zone

5. Gas/ventilation, communications and fire-system dependencies reviewed before impairment

6. Instrumentation calibration and trip-setting changes approved by mine engineering

7. Cable penetrations, fire barriers and physical protection restored and recorded

COMPLETING THE PRINTED ORIGINAL WORD

Tick Y, N or N/A for all original WORKFACE VERIFICATION / REQUIRED CONTROL rows and complete EVIDENCE / DEFECT / ACTION; identify feeder, switching permit and receiving mine authority.

MINE ELECTRICAL AUTHORITY AND STOP-WORK TRIGGER

The original HOLD clause requires stopping for unproved isolation, missing mine clearance, critical fire/gas alarm impairment or unknown stored electrical energy.

ESSENTIAL WORK ORDER AND TEST EVIDENCE

Use the actual mine area and asset identifiers, authorised switching schedule, feeder single-line revision, proof-of-dead and earthing evidence, UPS or VSD backfeed analysis, hazardous-area classification, mine gas/fire/communications interfaces and receiving official. Technical measurements, protection interlock results, competent signatures, and open defects must be traceable.

BUY ONE EDITABLE SOURCE ORIGINAL OR A COMPLETE MINE FILE

This R12.95 AD-C02 original Word document is included in the 371-document Underground Mining Checklist Package and in the 628-page Contractor Health and Safety File. Existing collection owners should avoid duplicate purchases. The mine's own appointments, isolation permissions, safe electrical switching and engineering acceptance remain mandatory.

THREE CLICKABLE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page