top of page

73 - AD-C01 | Electrical Ten-Point Task Readiness & Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95

AD-C01 — ELECTRICAL TEN-POINT TASK READINESS & PRESTART CHECKLIST

Ten genuine mine electrical prestart controls address switching, gas/dust classified zones, remote backfeed, flameproof equipment, critical alarms, tests, safe energisation and mine-owner release.

MINE ELECTRICAL TASK APPLICATION

For mine-approved underground electrical distribution, controls, instruments and hazardous-area tasks. Enter mine/site, contractor, work zone, work order and shift.

TEN ACTUAL SOURCE PRESTART CONTROLS

1. Mine electrical authority has issued work order and identified source equipment and all feeds.

2. Zone-specific methane/dust hazardous-area and permitted equipment classification confirmed before entry.

3. Mine electrical switching/isolation and test-before-touch authorised and documented.

4. Remote start, battery/DC, UPS, backfeed, capacitive and stored-energy hazards accounted for.

5. Flameproof/intrinsic-safety integrity and approved components maintained where required.

6. No electrical change is made to critical ventilation, winding, dewatering, fire or communications systems without impact consent.

7. Tools and test equipment approved/calibrated for mine zone; portable units checked.

8. Cables/earthing, glands, protection, alarms and temperature ratings inspected before test.

9. Test/energisation permit and exclusion of personnel from associated machinery in place.

10. Mine electrical owner witnesses and accepts safety-critical interlocks and safe handback.

COMPLETE THE ACTUAL PRINTED WORD FORM

Tick YES, NO or N/A and provide EVIDENCE / ACTION for all ten printed RELEASE / VERIFICATION POINT rows. The original separates CONTRACTOR CHECK from MINE / HOST RELEASE.

STOP WORK AND MINE SWITCHING AUTHORITY

Stop on unknown feeds, invalid switching permits, hazardous methane/dust conditions, failed protection or unauthorised remote starting. Restart requires the appointed mine owner's actual approval.

ORIGINAL TECHNICAL EVIDENCE

Keep the switching schedule and single-line revision, proof-of-dead, explosion-protection classification, UPS/VSD stored energy, calibration, gas/fire alarm impact, exclusion during test energisation and mine witness signatures.

SINGLE ORIGINAL OR FULL UNDERGROUND COLLECTION

This R12.95 editable Word is already included in the full 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either should avoid duplicate purchase. Mine electrical competence and switching releases remain essential.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page