72 - AD-00 | Electrical Annexure Scope Activation & Evidence Index
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AD-00 — ELECTRICAL ANNEXURE SCOPE ACTIVATION & EVIDENCE INDEX
Seven genuine DOCUMENT references activate the underground mine electrical, instrumentation and control-systems annexure. This is a source-document index, not a seven-point workface inspection.
WHERE THIS SOURCE WORKPACK IS USED
Use for mine-authorised distribution, sensor, switching and control-system contractor workpacks with a real host mine zone and current risk assessment.
SEVEN ACTUAL SOURCE DOCUMENT INDEX ITEMS
1. AD-C01 — Prestart mine interface and trade-specific readiness
2. AD-F01 — Hold/release sign-off for critical work stages
3. AD-R01 — Trade risk, skills and permit/authorisation record
4. AD-T01 — Inspection/test/work-completion evidence
5. AD-R02 — Repeat inspection / defect and corrective action log
6. AD-TT01/02 — Two dedicated toolbox / shift briefing subjects
7. CORE A–AA / AB — Common incident, inspection, PPE, emergency, access and mine permits
COMPLETING THE PRINTED ORIGINAL WORD
Complete DOCUMENT, WHY / WHERE IT IS USED and SOURCE / EVIDENCE REF entries against the active permit, mine electrical switching procedure and source trade or CORE annexure.
MINE ELECTRICAL AUTHORITY AND STOP-WORK TRIGGER
The original restricts flameproof and intrinsically safe work to specifically accepted competence and mine-approved apparatus. A document index cannot authorise the work.
ESSENTIAL WORK ORDER AND TEST EVIDENCE
Use the actual mine area and asset identifiers, authorised switching schedule, feeder single-line revision, proof-of-dead and earthing evidence, UPS or VSD backfeed analysis, hazardous-area classification, mine gas/fire/communications interfaces and receiving official. Technical measurements, protection interlock results, competent signatures, and open defects must be traceable.
BUY ONE EDITABLE SOURCE ORIGINAL OR A COMPLETE MINE FILE
This R12.95 AD-00 original Word document is included in the 371-document Underground Mining Checklist Package and in the 628-page Contractor Health and Safety File. Existing collection owners should avoid duplicate purchases. The mine's own appointments, isolation permissions, safe electrical switching and engineering acceptance remain mandatory.
THREE CLICKABLE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

