top of page

72 - AD-00 | Electrical & Control Systems Annexure Activation Index

R 12,95Price

Buy 4 Checklists, Get 1 Free

SURFACE MINING SINGLES PROMOTION — Choose five individual editable Word forms for the price of four, ten for eight or fifteen for twelve. This authentic private AVC Single is R12.95.

THE ACTUAL MINE ELECTRICAL HAZARD

The actual AD scope index activates authorised distribution, MCC, control, sensor, mine lighting, LV instrumentation and communication work and directs the supervisor to the appropriate documents. Specialist mine electrical authority remains separate.

ORIGINAL DOCUMENT CONTROLS — PRINTED SOURCE ORDER

1. AD-C01: identify original mine electrical task readiness and prestart evidence.

2. AD-F01: locate critical electrical hold/release and handover stages.

3. AD-R01: locate skills, permits and mine specific authorisations.

4. AD-T01: locate inspection, test and work-completion records.

5. AD-R02: locate repeated inspections, defects and correction log.

6. AD-TT01/02: find stored-energy and controlled-energisation toolbox briefings.

7. CORE A–AA / AB: locate incidents, inspections, PPE, emergency, access and mine permit records.

EVIDENCE AND TRUE WORD DOCUMENT FIELDS

This is original AVC AD-00, a seven-entry scope/evidence index, not an electrical inspection within Electrical, Instrumentation & Control Systems. Seven original DOCUMENT, WHY/WHERE IT IS USED and SOURCE/EVIDENCE REF rows, site, scope/location, permit/risk assessment version, company, mine area owner and ANNEXURE ACTIVE Y/N.

STOP-WORK, HOLD AND AUTHORITY

Mark ACTIVE or N/A for the actual work order. No line of the index grants electrical switching permission, statutory engineering authority or mine production access.

PRACTICAL APPLICATION ON MINE WORKFACES

Use at the front of the trade binder to find supporting documents rather than claiming it is a ten-point inspection. Fill the editable Word DOCX with real equipment tags, permit IDs, test measurements and appropriate mine sign-off. An unanswered technical gate or blank result must remain open, not be converted into an accepted record.

WHICH AVC PRODUCT MAKES SENSE?

Buy this Single if you only need electrical & control systems annexure activation index. The IDENTICAL original Word document is ALREADY INCLUDED in both the complete 386-document Surface Mining Checklist Package and the full Surface Mining Contractor Health and Safety File. Anyone who already bought either larger product does NOT need to buy this Single again.

Explore all individual AVC Safety Checklist Singles

See the complete 386-document Surface Mining Checklist Package

See the full Surface Mining Contractor Health & Safety File

Follow the host mine's current electrical switching rules, work order, COP/SOP and actual technical release authorities. Editable contractor records are practical evidence, not permission to open live plant or bypass a safety-critical trip.

    bottom of page