top of page

71 - AC-TT04 | Structural Repair Failure Recognition & Withdrawal Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AC-TT04 — STRUCTURAL REPAIR FAILURE RECOGNITION & WITHDRAWAL TALK

Six genuine underground civil repair emergency-withdrawal points address barricading from TMM and rail traffic, embedded services, mine-safe concrete, engineered temporary supports, survey as-builts and controlled dust/slurry disposal.

MINE CIVIL REPAIR WORK SCOPE

Use before mine-zone concrete, structural repair, masonry, trenching or alterations and after changed mine permits, shifts or support conditions. Complete MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER.

SIX REAL UNDERGROUND REPAIR TALK CONTROLS

1. Work zone is barricaded from TMM traffic, rail routes and live production

2. Services search and drawings identify buried/embedded cables, water and mine communications

3. Concrete and curing materials meet underground fire, exposure and ventilation requirements

4. Temporary propping capacity and ground loads have competent engineering approval

5. Mine survey datum and as-built dimensions checked before handback

6. Dust, slurry, waste and wash water removed without blocking drains

COMPLETING THE ORIGINAL WORD FIELDS

Brief the six printed source points in their original sequence, checking segregation from production, buried mine utilities, fire performance and ventilation of curing materials, signed propping design, survey datum and drainage-safe cleaning. Capture 16 genuine attendance signatures.

STOP WORK AND MINE STRUCTURAL AUTHORITY

Source requires STOP / WITHDRAW / NOTIFY MINE CONTROL on unexpected support damage, cracking, gas, water inflow or blocked escapeway. Mine-authorised zone release is mandatory.

MINE CIVIL EVIDENCE AND OPERATOR ACCEPTANCE

Document the actual mine work order, rock engineering authorisation, support design, mine access segregation, embedded utilities isolation, approved material/fire specifications, silica ventilation, drainage controls and signed survey/as-built handback. This source-original editable Word records safe work evidence but cannot independently authorise mine ground-support removal, structural design or re-opening a restricted escape route.

SINGLE ORIGINAL OR COMPLETE UNDERGROUND PACKAGE

This R12.95 AC-TT04 Word original is included in the full 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying a duplicate. Mine-appointed engineering, rock-support, ventilation and access releases remain necessary.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page