70 - AC-TT03 | Structural Repair Shift Change & Workface Lessons Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AC-TT03 — STRUCTURAL REPAIR SHIFT CHANGE & WORKFACE LESSONS TALK
Six authentic mine civil shift handover controls verify that repairs protect ground support, refuge integrity and escape dimensions, follow rock engineer approval, and use approved zone barricades, services identification, concrete specifications and temporary props.
MINE CIVIL REPAIR WORK SCOPE
Use before each structural or building-repair shift change, especially near mine escape travel routes, TMM/rail traffic, embedded utilities or rock-support interfaces. Complete MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER.
SIX REAL UNDERGROUND REPAIR TALK CONTROLS
1. Approved civil repair limits do not alter rock support, refuge integrity or mine escape dimensions
2. Rock engineering approval covers drilling, cutting, grouting and any support interface
3. Work zone is barricaded from TMM traffic, rail routes and live production
4. Services search and drawings identify buried/embedded cables, water and mine communications
5. Concrete and curing materials meet underground fire, exposure and ventilation requirements
6. Temporary propping capacity and ground loads have competent engineering approval
COMPLETING THE ORIGINAL WORD FIELDS
Talk through six original printed controls with each affected crew: work limits, rock engineering interface, barriers against production traffic, hidden services, underground fire/ventilation properties of curing products and engineered propping. Retain 16 signatures.
STOP WORK AND MINE STRUCTURAL AUTHORITY
STOP for new cracks, mine rock-support damage, air/gas issues, water ingress or inaccessible escape route. Previous shift approval does not replace current mine release.
MINE CIVIL EVIDENCE AND OPERATOR ACCEPTANCE
Document the actual mine work order, rock engineering authorisation, support design, mine access segregation, embedded utilities isolation, approved material/fire specifications, silica ventilation, drainage controls and signed survey/as-built handback. This source-original editable Word records safe work evidence but cannot independently authorise mine ground-support removal, structural design or re-opening a restricted escape route.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND PACKAGE
This R12.95 AC-TT03 Word original is included in the full 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying a duplicate. Mine-appointed engineering, rock-support, ventilation and access releases remain necessary.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

