top of page

7 - AB-05-C01 | Underground Ground Control & Fall-of-Ground Check

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95

AB-05-C01 — UNDERGROUND GROUND CONTROL & FALL-OF-GROUND CHECK

This genuine Underground Mining AB-05-C01 original editable Word contains 10 mine source-specific workface safety-release verification points. The actual source requirements appear below; no generic substitute form or invented test count is being sold.

SITE-SPECIFIC MINE SCOPE AND AUTHORITY

Use Underground Ground Control & Fall-of-Ground Check with a real mine work order, level/zone, supervisor, shift, host operator approval and the current mine Code of Practice or operational SOP. Confirm personnel, equipment and technical limitations before the work starts.

TEN ORIGINAL UNDERGROUND MINE SOURCE CHECKS

1. Mine appointed ground-control person has certified the work-area access conditions.

2. Contractor identifies unsupported roof/sidewall, cracking, spalling and loose material indicators.

3. Approved standing/working areas and roadway restrictions demarcated.

4. No drilling, cutting, lifting anchor or support alteration without ground-engineering permit.

5. Shaft/void/ore pass/raise and damaged barrier exclusions signed off.

6. Seismic alerts, blasting, wet conditions and rehabilitation impacts reviewed.

7. Crew has communication path to stop work and withdraw on deteriorating ground.

8. Temporary propping or structure loads evaluated by mine engineer.

9. No contractor personnel scaling or installing statutory rock support by inference.

10. Mine supervisor releases access again following any ground condition change.

COMPLETING THE ACTUAL WORD RECORD

Complete the real RELEASE / VERIFICATION POINT rows YES, NO or N/A, provide EVIDENCE / ACTION for each and cite work-zone inspection, permits, technical test proof and the mine's receiving authority.

MINE SAFETY STOP-WORK AND RE-ENTRY

Any changed ground, gas, support, refuge, transport, escape or permit condition requires renewed task risk assessment and appropriate mine control. A critical failed item means STOP, escalation, correction and mine-owned release; a contractor signature is evidence, not mining permission.

INDIVIDUAL WORD ORIGINAL OR COMPLETE MINE COLLECTION

This R12.95 AB-05-C01 original is already included in the full 371-document Underground Mining Checklist Package and 628-page Contractor H&S File. Existing customers should avoid buying duplicate content. Mine induction, competent authorisations and actual return-to-service release remain essential.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page