69 - AC-TT02 | Silica & Temporary Stability in Underground Repairs Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AC-TT02 — SILICA & TEMPORARY STABILITY IN UNDERGROUND REPAIRS TALK
Five source-original underground civil silica and temporary stability talk items connect competent ground-condition exclusion checks, crystalline silica and cement-slurry control, shaft/conveyance limits, engineered propping and protected emergency routes.
MINE CIVIL REPAIR WORK SCOPE
Use for underground drilling, grouting, cutting, repair, concrete handling and temporary structural changes. Fill Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.
FIVE ORIGINAL UNDERGROUND WORKFACE POINTS
1. Ground condition and exclusion restrictions confirmed by mine-appointed competent person before work.
2. Dust, crystalline silica, cement, slurry and contamination controls effective with host ventilation.
3. Materials and debris transport compatible with shaft/conveyance load, dimensions and evacuation routes.
4. Temporary propping/structural alterations engineered and inspected before removing support.
5. Keep material deliveries, services and debris clear of escapeways and report any reduction of the approved travel section.
COMPLETING THE ORIGINAL WORD FIELDS
Brief all five printed items using current mine COP/SOP, dust suppression and ventilation, load/dimensional logistics, inspected temporary supports and clear escapeways. Record the original NAME / STAFF NO. and SIGNATURE attendance.
STOP WORK AND MINE STRUCTURAL AUTHORITY
The printed STOP-WORK TRIGGER applies to ground movement, damaged support, blocked escape, air deficiency or missing engineering approval. Respiratory and ground control decisions remain site-specific.
MINE CIVIL EVIDENCE AND OPERATOR ACCEPTANCE
Document the actual mine work order, rock engineering authorisation, support design, mine access segregation, embedded utilities isolation, approved material/fire specifications, silica ventilation, drainage controls and signed survey/as-built handback. This source-original editable Word records safe work evidence but cannot independently authorise mine ground-support removal, structural design or re-opening a restricted escape route.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND PACKAGE
This R12.95 AC-TT02 Word original is included in the full 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying a duplicate. Mine-appointed engineering, rock-support, ventilation and access releases remain necessary.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

