top of page

68 - AC-TT01 | Building Repair Near Mine Ground Support & Escape Routes Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AC-TT01 — BUILDING REPAIR NEAR MINE GROUND SUPPORT & ESCAPE ROUTES TALK

Five actual underground building repair briefing points require approved mine work areas, engineering protection of ground support/refuge/shaft/escape routes, approved drawing and fire specs, isolation of embedded services and ground release after disruptive work.

MINE CIVIL REPAIR WORK SCOPE

Use before alterations near rock bolts, mine support, refuge rooms, shafts, essential services or designated escape access. Complete Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.

FIVE ORIGINAL UNDERGROUND WORKFACE POINTS

1. Approved underground work area and mine technical owner identified for every alteration.

2. Mine engineer confirms no structural work interferes with ground support, refuge, shaft infrastructure or escape access.

3. Approved drawing revisions, material/fire performance specifications and change permits filed.

4. Services beneath/behind walls and floors found and isolated using mine process.

5. Reconfirm ground-release and barricades after drilling, demolition or changes to temporary support.

COMPLETING THE ORIGINAL WORD FIELDS

Brief five genuine printed checks with mine-appointed technical owners, document revised drawings and approval limits, trace embedded pipes/cables, coordinate drilling/demolition permissions and renew support/barrier releases. Capture attendance names and signatures.

STOP WORK AND MINE STRUCTURAL AUTHORITY

STOP for changed ground, missing mine engineer permission, cracked or damaged support, blocked travel routes or deficient mine air; no contractor talk approves a mining structural change.

MINE CIVIL EVIDENCE AND OPERATOR ACCEPTANCE

Document the actual mine work order, rock engineering authorisation, support design, mine access segregation, embedded utilities isolation, approved material/fire specifications, silica ventilation, drainage controls and signed survey/as-built handback. This source-original editable Word records safe work evidence but cannot independently authorise mine ground-support removal, structural design or re-opening a restricted escape route.

SINGLE ORIGINAL OR COMPLETE UNDERGROUND PACKAGE

This R12.95 AC-TT01 Word original is included in the full 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying a duplicate. Mine-appointed engineering, rock-support, ventilation and access releases remain necessary.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page