top of page

62 - AC-H02 | Civil Repair Witness Hold & Mine Return-to-Service Gate

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AC-H02 — CIVIL REPAIR WITNESS HOLD & MINE RETURN-TO-SERVICE GATE

Five original mine-controlled civil repair witness holds require accepted repair limits preserving support, refuge and escape routes, rock engineering approval, TMM/rail production barriers, embedded mine service surveys and concrete/curing fire and ventilation specifications.

WHERE THE ORIGINAL MINE CIVIL RECORD APPLIES

Use before or after critical underground structural or building repair stages and at restricted mine-zone release. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.

FIVE ORIGINAL MINE CIVIL WITNESS HOLD GATES

1. Approved civil repair limits do not alter rock support, refuge integrity or mine escape dimensions

2. Rock engineering approval covers drilling, cutting, grouting and any support interface

3. Work zone is barricaded from TMM traffic, rail routes and live production

4. Services search and drawings identify buried/embedded cables, water and mine communications

5. Concrete and curing materials meet underground fire, exposure and ventilation requirements

HOW TO COMPLETE THIS ORIGINAL WORD

For each of five real HOLD TRIGGER / EVIDENCE GATE source entries document REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS, with appointed rock engineer, repairs, traffic and utility approvals.

STOP WORK AND MINE ENGINEERING RELEASE

Source RELEASE CONDITION requires every applicable hold PASS, corrected defects witnessed and named mine authority's valid release. Contractor evidence never grants permission to return mine premises or systems to service.

TECHNICAL EVIDENCE AND MINE WORK ZONE CONTROL

Record the real mine-zone work order, competent rock engineering release, permitted drilling/grouting, approved support design, surveyed as-builts, embedded services clearance, TMM/rail segregation, concrete testing, silica ventilation and receiving mine officer. This editable source-original Word documents contractor actions but cannot authorise removal of support, changes to refuge integrity or re-opening an obstructed escape route.

INDIVIDUAL SOURCE OR COMPLETE MINE FILE

This R12.95 AC-H02 original Word is included in the full 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Owners of either collection should avoid duplicate buying. Independent mine authority and accepted changes are required.

THREE LIVE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page