60 - AC-C03 | Civil Repair Critical Task & Emergency Readiness Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95
AC-C03 — CIVIL REPAIR CRITICAL TASK & EMERGENCY READINESS CHECKLIST
Seven original underground civil critical-task checks address rock engineering for support interfaces, TMM/rail traffic barricades, buried service searches, concrete and curing fire/exposure controls, engineered propping, mine survey/as-built handback and slurry-free drainage.
WHERE THE MINE CIVIL ORIGINAL APPLIES
Use before mine-room construction, underground concrete repairs, support-adjacent drilling and civil service work where changes can affect people, machines, refuge or evacuation.
SEVEN PRINTED CIVIL REPAIR WORKFACE CHECKS
1. Rock engineering approval covers drilling, cutting, grouting and any support interface
2. Work zone is barricaded from TMM traffic, rail routes and live production
3. Services search and drawings identify buried/embedded cables, water and mine communications
4. Concrete and curing materials meet underground fire, exposure and ventilation requirements
5. Temporary propping capacity and ground loads have competent engineering approval
6. Mine survey datum and as-built dimensions checked before handback
7. Dust, slurry, waste and wash water removed without blocking drains
HOW TO COMPLETE THE PRINTED WORD
Tick Y/N/N/A for all seven WORKFACE VERIFICATION / REQUIRED CONTROL points and record EVIDENCE / DEFECT / ACTION, mine zone, work order, date/shift/permit and contractor supervisor.
STOP WORK AND MINE STRUCTURAL AUTHORITY
Original HOLD instruction stops work if mine clearance, energy isolation, emergency provisions, ground support or critical evidence is missing. Reassess changing shifts or conditions.
MINE-APPROVED CONTROLS AND TECHNICAL EVIDENCE
Keep approved mine drawings, geotechnical/rock-engineering release, service isolation, underground transport and traffic restrictions, concrete and fire-performance evidence, support design, silica/ventilation results, restoration of escape access and signed mine acceptance. This original editable Word records evidence, not authority to alter mine ground support, refuge routes or statutory equipment.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND COLLECTION
This R12.95 AC-C03 Word original is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners of either should avoid buying twice. Mine engineering and access authority must be separately approved.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

