6 - AB-04-C01 | Underground Area, Mine Activity & Hazard Map
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AB-04-C01 — UNDERGROUND AREA, MINE ACTIVITY & HAZARD MAP
This editable AB-04-C01 original underground mine workface verification document contains 10 genuine printed source release and verification points. It is not a generic substitute and does not issue mine approval.
SOURCE-ORIGINAL UNDERGROUND MINE APPLICATION
Use for Underground Area, Mine Activity & Hazard Map at the correct mine, level, working area and operator-controlled task. Record the mine company, work order, supervisor, permit, area-specific risk assessment and appointed host officials before work.
10 ACTUAL UNDERGROUND MINE VERIFICATION ITEMS
1. Work area classified by shaft, level, section, roadway, heading, workshop or transfer station.
2. Mine rock/strata and fall-of-ground status communicated by competent mine official.
3. Airflow route, ventilation district, heat, smoke and gas monitoring identified.
4. Blasting and seismic/production exclusion windows agreed.
5. Dust/combustible dust, methane and ignition/explosion controls determined for the mine type.
6. Water, old workings, mud/rock rush and inundation risk as indicated by mine.
7. Trackless traffic, rail, belt and shaft conveyance interfaces mapped.
8. Refuge and emergency exit route reachable during planned activities.
9. Confined entry or isolated zones excluded until separate host permission.
10. All route changes or altered mine conditions trigger new area release.
USING AND COMPLETING THE EDITABLE WORD SOURCE
Tick each printed RELEASE / VERIFICATION POINT YES, NO or N/A, explain failures in EVIDENCE / ACTION and include real site-specific evidence, operator approval and competent person decision.
CRITICAL MINE AUTHORITY AND STOP WORK
A critical NO, failed gate, incomplete inspection, unsafe zone or missing mine technical work release requires STOP, escalation and competent operator re-authorisation before work proceeds. Contractor sign-off alone never grants mining permission.
INDIVIDUAL SOURCE OR COMPLETE MINE COLLECTION
This R12.95 AB-04-C01 source-original Word is included in the 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Existing owners should avoid duplicate purchases. Site adaptation and mine-owned permission remain mandatory.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

