59 - AC-C02 | Civil Repair Underground Shift & Area Readiness Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95
AC-C02 — CIVIL REPAIR UNDERGROUND SHIFT & AREA READINESS CHECKLIST
Seven authentic source mine structural repair shift checks begin with not altering rock support, refuge integrity or escape dimensions and end with survey datum and as-built verification after safe propping, service isolation and traffic separation.
WHERE THE MINE CIVIL ORIGINAL APPLIES
Use at underground civil works shift start or changed-condition checks around existing rock support, mine escape access, embedded utilities and concrete/curing works.
SEVEN PRINTED CIVIL REPAIR WORKFACE CHECKS
1. Approved civil repair limits do not alter rock support, refuge integrity or mine escape dimensions
2. Rock engineering approval covers drilling, cutting, grouting and any support interface
3. Work zone is barricaded from TMM traffic, rail routes and live production
4. Services search and drawings identify buried/embedded cables, water and mine communications
5. Concrete and curing materials meet underground fire, exposure and ventilation requirements
6. Temporary propping capacity and ground loads have competent engineering approval
7. Mine survey datum and as-built dimensions checked before handback
HOW TO COMPLETE THE PRINTED WORD
For all seven Y/N/N/A original WORKFACE VERIFICATION / REQUIRED CONTROL rows enter actual EVIDENCE / DEFECT / ACTION, mine level, work order, zone and receiving mine authority.
STOP WORK AND MINE STRUCTURAL AUTHORITY
The original HOLD clause requires active mine engineer permission and support controls. A previous shift's approval cannot automatically permit revised excavation, propping or disrupted mine access.
MINE-APPROVED CONTROLS AND TECHNICAL EVIDENCE
Keep approved mine drawings, geotechnical/rock-engineering release, service isolation, underground transport and traffic restrictions, concrete and fire-performance evidence, support design, silica/ventilation results, restoration of escape access and signed mine acceptance. This original editable Word records evidence, not authority to alter mine ground support, refuge routes or statutory equipment.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND COLLECTION
This R12.95 AC-C02 Word original is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners of either should avoid buying twice. Mine engineering and access authority must be separately approved.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

