58 - AC-C01 | Civil Repair Ten-Point Task Readiness & Prestart Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95
AC-C01 — CIVIL REPAIR TEN-POINT TASK READINESS & PRESTART CHECKLIST
TEN original mine civil prestart controls protect rock support, refuge and escape routes, approved drawings/materials, buried services, silica exposure, shaft logistics, temporary propping, dropped objects and final emergency-route restoration.
WHERE THE MINE CIVIL ORIGINAL APPLIES
Use before approved underground masonry, repair, concrete and building maintenance. Record mine/site, company, work zone, shift, work order and supervisor.
TEN SOURCE-ORIGINAL MINE CIVIL PRESTART POINTS
1. Approved underground work area and mine technical owner identified for every alteration.
2. Mine engineer confirms no structural work interferes with ground support, refuge, shaft infrastructure or escape access.
3. Approved drawing revisions, material/fire performance specifications and change permits filed.
4. Services beneath/behind walls and floors found and isolated using mine process.
5. Ground condition and exclusion restrictions confirmed by mine-appointed competent person before work.
6. Dust, crystalline silica, cement, slurry and contamination controls effective with host ventilation.
7. Materials and debris transport compatible with shaft/conveyance load, dimensions and evacuation routes.
8. Temporary propping/structural alterations engineered and inspected before removing support.
9. Work-at-height/dropped-object and traffic segregation controls verified at restricted access.
10. Emergency/refuge routes, doors, detection, ventilation and signage restored after completion.
HOW TO COMPLETE THE PRINTED WORD
Record YES/NO/N/A and EVIDENCE / ACTION for all ten actual RELEASE / VERIFICATION POINT rows, with a separate CONTRACTOR CHECK and MINE / HOST RELEASE.
STOP WORK AND MINE STRUCTURAL AUTHORITY
Original RELEASE RULE requires all mine-owned critical holds released. Do not infer authority to alter geotechnical support or emergency travel routes.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND COLLECTION
This R12.95 AC-C01 Word original is included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners of either should avoid buying twice. Mine engineering and access authority must be separately approved.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

