top of page

54 - AB-TT03 | Shaft, TMM, Rail, Belt & Material Movement Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95

AB-TT03 — SHAFT, TMM, RAIL, BELT & MATERIAL MOVEMENT TALK

The four original mine transport safety points check approved shafts/conveyances and walking routes, separation from TMM/rail/conveyor/hoist movement, rated material handling and signalling, and operating lighting, barriers, proximity warnings and shift transport permissions.

WHERE THIS MINE CORE TOOLBOX TALK APPLIES

Use before moving workers, materials, plant and repair tools through mine shafts, underground vehicle roads, rail corridors or belt transfer points. Complete Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.

FOUR ACTUAL SOURCE MINE SAFETY POINTS

1. Use only approved shafts, conveyances, roads and pedestrian refuge routes.

2. Do not enter vehicle blind spots, rail corridors, conveyor work envelopes or hoist areas without operator control.

3. Secure materials within declared load capacities, and use approved communication signals.

4. Check lighting, proximity warnings, barriers and shift transport permissions.

COMPLETING THE ORIGINAL WORD TOOLBOX

Brief all four actual source controls with approved winder/shaft routes, mine pedestrian refuge, vehicle blind spots, competent communication signals, shaft/conveyance load limits, spotter arrangements and shift-specific transport clearance. Capture the original crew attendance signatures.

MINE ENTRY, TRAFFIC AND STOP-WORK AUTHORITY

Printed STOP-WORK TRIGGER: unauthorised shaft entry, missing spotter, unclear movement routes or uncontrolled moving machinery. Mine transport officials must issue access and movement permission.

RETAINED MINE PERMIT AND CREW EVIDENCE

Keep the named mine work area, approved mine COP/SOP, current work order, safe personnel movement, equipment and worker IDs, responsible mine official, exact stop-work trigger and real control-room notification route. This source-original Word is a crew briefing record and does not issue an underground work permit or mine transport authorisation.

INDIVIDUAL SOURCE OR COMPLETE MINE COLLECTION

This R12.95 AB-TT03 Word source is included in the full 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Existing owners should avoid duplicate purchases. Mine induction, worker tracking, critical movement and host-controlled release remain mandatory.

THREE LIVE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page