53 - AB-TT02 | Ground Control, Gas, Ventilation & Stop-Work Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AB-TT02 — GROUND CONTROL, GAS, VENTILATION & STOP-WORK TALK
Four genuine underground workface toolbox points require mine-appointed ground/strata and roof/sidewall restriction review, checked air quantity/gas/dust controls, active warning for loose strata and rising water, and mine-controlled withdrawal/re-entry.
UNDERGROUND MINE CORE WORKFACE APPLICATION
Use before underground repairs or construction near excavations, support structures, active mining areas or changing airflow. Complete Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.
FOUR TRUE ORIGINAL TOOLBOX SAFETY POINTS
1. Mine responsible person identifies ground/strata and roof or sidewall restrictions before work.
2. Confirm ventilation, mine gas/dust monitoring and the requirements for permitted tools/equipment.
3. Watch for loose ground, changing air flow, gas alerts, rising water or mine production changes.
4. Withdraw promptly under mine procedure and only return after competent mine release.
USING THE ORIGINAL WORD TOOLBOX TALK
Brief all four original points; identify the appointed ground-control official, mine ventilation limits and approved tools, mine gas or strata alarms, production changes, escape routes and contractor responsibilities. Record names and signatures.
STOP WORK AND MINE OWNER DECISION
Printed STOP-WORK TRIGGER: unsafe or uncertain roof, failed gas/ventilation controls, warning alarms or flooding. Only the mine competent person can clear re-entry after abnormal ground or atmosphere.
MINE EMERGENCY, PERMIT AND ATTENDANCE EVIDENCE
Document the active mine work order, location and shift, host mine permit, current mine COP/SOP, safety-critical service dependencies, competency and withdrawal instructions. Identify the person accountable for a changed hazard, any required rescue support, the actual mine control-room reporting route and the valid re-entry/recommissioning release. The editable Word records worker participation and hazard controls, not independent permission for mining operations.
BUY THIS SINGLE OR COMPLETE MINE COLLECTION
This R12.95 AB-TT02 original Word is already included in the 371-document Underground Mining Checklist Package and complete 628-page Underground Mining Contractor Health and Safety File. Existing collection owners should avoid duplicate purchases. The host mine must authorise underground access, critical systems and all applicable permits.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

