top of page

48 - AB-R14 | Mine Ground Support Disturbance & Engineering Change Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AB-R14 — MINE GROUND SUPPORT DISTURBANCE & ENGINEERING CHANGE REGISTER

Five original rock-engineering change entries track exact workplace/support identifier, baseline ground-support design and approval, requested repair/drilling/disturbance, engineering design hold/release and final tested as-built handover.

WHERE THIS MINE CORE REGISTER APPLIES

Use before planned or unplanned underground rock-support interaction, concrete repairs near strata, bolt interference, excavation or structural work that could change the approved support scheme. Record mine level/zone and owner.

FIVE AUTHENTIC MINE-OWNED EVIDENCE ITEMS

1. Exact working place and affected support ID

2. Baseline support plan and approval reference

3. Requested disturbance/drilling/repair scope

4. Rock engineering hold and design release

5. Completion inspection/test and as-built reference

HOW TO COMPLETE THE PRINTED WORD

Complete the five genuine MINING-SPECIFIC ITEM / EVIDENCE TO TRACK items with source document, measured result, DATE / AUTHORITY / STATUS, the mine engineer's approved drawings and reinspection/as-built evidence.

STOP-WORK AND MINE AUTHORITY RELEASE

The source does not grant rock-support alteration approval; changed ground or missing engineered hold release demands STOP and action by the mine-appointed rock engineering official.

MINE WORK ORDER AND RETAINED EVIDENCE

The source register requires actual evidence, not unexplained blanks. Reference current mine-controlled forms, revision, technical results, outstanding defect or NCR, reinspection and retention file. The original provides contractor supervisor and host mine authority close-out fields and date/release reference. Use current COP/SOP, work-zone and permit details rather than treating a register entry as a mine technical permission.

SINGLE ORIGINAL OR COMPLETE UNDERGROUND COLLECTION

This R12.95 AB-R14 original editable Word is already contained in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid repeat buying. Mine operator work control and appropriate technical acceptance remain mandatory.

THREE LIVE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page