40 - AB-R06 | Underground Mine Equipment Entry & Return-to-Service Register
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AB-R06 — UNDERGROUND MINE EQUIPMENT ENTRY & RETURN-TO-SERVICE REGISTER
The original underground mine five-column OPEN-ENTRY equipment entry and return-to-service register records the actual item or asset, pre-entry acceptance, designated mine owner/area, technical test or defect and formal mine hand-back.
UNDERGROUND MINE CORE USE AND WORK ZONES
Use for underground contractor plant, TMM interfaces, electrical equipment, lifting apparatus or other equipment moving into mine-controlled work zones and undergoing a maintenance/return-to-service decision. Fill Underground mine / site, Company, Contract / work order and Responsible person.
FIVE ACTUAL OPEN-ENTRY SOURCE REGISTER COLUMNS
ITEM / ASSET
INSPECTION / ACCEPTANCE
AREA / OWNER
TEST / DEFECT
HAND-BACK
COMPLETING THE ORIGINAL WORD RECORD
Complete the source's actual ITEM / ASSET, INSPECTION / ACCEPTANCE, AREA / OWNER, TEST / DEFECT and HAND-BACK headings. Record mine work order, asset ID, competent inspector, restriction, acceptance evidence and named host-mine official.
MINE OPERATOR CONTROL AND STOP-WORK
A contractor may record defects and repairs but cannot grant underground equipment admission or recommissioning on this register alone. The original CONTROL requires updates for changed authorisations, hazards and plant; unresolved issues stay open.
IMPORTANT DIFFERENCE FROM OPENCAST / SURFACE VERSION
This is the UNDERGROUND original Word document for the named mine zone and underground work authorisations. The distinct Open-Cast Mining product is a separate edition with its own downloaded Word source. Do not substitute the surface file when underground emergency, access, support, atmosphere and mine-appointed system rules apply.
MINE EVIDENCE AND PERSON ACCOUNTABILITY
Record the current mine COP/SOP, actual work order, competent mine official, area, equipment or incident identifier, shift/time, review outcome and correction or permitted restart. The original is an administrative log and does not grant mine entry, critical system activation, or statutory permissions. Retain source documents and changed-condition records.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND FILE
This R12.95 AB-R06 Word is included in the full 371-document Underground Mining Checklist Package and 628-page Underground Mining Contractor H&S File. If you own either collection, avoid a duplicate purchase. Mine-approved work permissions remain compulsory.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

