4 - AB-03-C01 | Underground Contractor Mobilisation & Entry Gate
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AB-03-C01 — UNDERGROUND CONTRACTOR MOBILISATION & ENTRY GATE
This editable AB-03-C01 original underground mine workface verification document contains 10 genuine printed source release and verification points. It is not a generic substitute and does not issue mine approval.
SOURCE-ORIGINAL UNDERGROUND MINE APPLICATION
Use for Underground Contractor Mobilisation & Entry Gate at the correct mine, level, working area and operator-controlled task. Record the mine company, work order, supervisor, permit, area-specific risk assessment and appointed host officials before work.
10 ACTUAL UNDERGROUND MINE VERIFICATION ITEMS
1. Work order, approved scope, contract contact and H&S file status verified.
2. Each worker named, inducted, medically fit and authorised for specific underground work area.
3. Body-worn self-contained self-rescuer issued and used as mine regulation requires.
4. Self-rescuer user training and inspection/expiry arrangements accepted.
5. Shaft conveyance/entry procedure, approved access routes and tracking system explained.
6. Mine supervisor confirms communications, refuge, escapeway and emergency numbers.
7. Tools, plant, vehicles and materials approved for underground conditions and transport.
8. Worker authorisations, legal competence and maintenance certificates verified.
9. Shift risk assessment, gas/ground conditions, blasting exclusion and permit valid.
10. Operator grants work-area release before the crew enters or starts the job.
USING AND COMPLETING THE EDITABLE WORD SOURCE
Tick each printed RELEASE / VERIFICATION POINT YES, NO or N/A, explain failures in EVIDENCE / ACTION and include real site-specific evidence, operator approval and competent person decision.
CRITICAL MINE AUTHORITY AND STOP WORK
A critical NO, failed gate, incomplete inspection, unsafe zone or missing mine technical work release requires STOP, escalation and competent operator re-authorisation before work proceeds. Contractor sign-off alone never grants mining permission.
INDIVIDUAL SOURCE OR COMPLETE MINE COLLECTION
This R12.95 AB-03-C01 source-original Word is included in the 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Existing owners should avoid duplicate purchases. Site adaptation and mine-owned permission remain mandatory.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles