top of page

386 - AX-TT04 | Quarry Processing Shift Transfer & Restart Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Five eligible Singles cost the price of four, ten the price of eight, or fifteen the price of twelve when the promotion applies. Verify the cart discount. Browse individual checklists. Confirm the discount in your cart.

386 / AX-TT04 — QUARRY SHIFT TRANSFER & CONTROLLED RESTART

WHY THIS TOOLBOX TALK IS NECESSARY

A shift change at a crusher or wash plant may leave the next crew unaware of open guards, changed isolation boundaries, unstable faces or water-pumping problems. AX-TT04 gives quarry crushing, screening, dredging and aggregate-washing workers a one-page briefing before work passes between shifts or restarts after changed mine instructions. It connects handover to actual machine condition and the need for mine-authorised release.

SIX REAL CHECKPOINTS IN THE SOURCE DOCUMENT

1) Quarry production owner witnesses staged restart and verifies pond/plant safeguards. 2) Test start-up interlocks, water pressure, emergency stops and dust capture. 3) Record traceability for replaced wear liners, mesh, spray nozzles and belts. 4) Control rockfall zones, bench/crest stability and stockpile drawdown. 5) Assess sediment settlement, discharge-permit conditions and turbidity restrictions. 6) Verify screen, conveyor and crusher guarding before opening maintenance.

WHEN, WHERE AND WHO USES IT

At the actual crushing/screening line, dredging area, wash circuit or quarry face, the presenter briefs incoming workers before task transfer or restart. Review unfinished maintenance, site movement boundaries, changed permits and any risks handed over by the outgoing crew. Do not treat a shift briefing as permission to energise plant.

HOW TO COMPLETE AND FILE THE FORM

Fill in MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER on the original Word document. Discuss each numbered point against the real equipment and work order. Capture unresolved controls in the associated shift workpack. Its editable A4 attendance table contains 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE rows. Obtain crew signatures and retain the briefing with mine permit and shift-handover evidence.

STOP / WITHDRAW / NOTIFY MINE CONTROL

The printed stop instruction covers an unstable face, unguarded moving plant, overflowing pond or trapped aggregate release. Withdraw and notify mine control. Restart must await the mine-authorised official's release of the affected area or system. A signed attendance sheet is not an isolation certificate, environmental permission or operator restart permit.

SINGLE, CHECKLIST PACKAGE OR COMPLETE SAFETY FILE

This exact original A4 Word form costs R12.95. It is already included in the 386-document Surface Mining Checklist Package at R2,315.95 (approximately R6 per form) and the complete 635-page Surface Mining Contractor H&S File. Both larger products include this identical Word original. If you already own either, do not purchase the Single again.

SOURCE AX-TT04 | SECTION AX | EDITABLE A4 DOCX

    bottom of page