top of page

384 - AX-TT02 | Quarry Mine Operating Interface & Handover Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Buy five eligible Singles for four, ten for eight or fifteen for twelve, subject to the current offer. Browse individual checklists. Confirm the discount in your cart.

384 / AX-TT02 — MINE OPERATING INTERFACE & HANDOVER

WHY THIS QUARRY TALK MATTERS

Dredging, washing and quarry processing bring together plant maintenance, mine production, water management and access control. AX-TT02 provides an original one-page briefing so crews understand those interfaces before a shift handover, workface entry or restart after changed instructions. A missed dredge anchor, water intake exposure or unguarded screen can harm the next crew even when a previous team considered its job complete.

SIX PRINTED WORKFACE CHECKS

1) Assess water intake, wash-plant ponds and dredge anchoring/access as applicable. 2) Verify screen, conveyor and crusher guards before opening maintenance. 3) Assess sediment settlement, discharge permits and turbidity restrictions. 4) Control quarry-face rockfall, bench/crest stability and stockpile drawdown. 5) Record traceability of changed wear liners, mesh, spray nozzles and belts. 6) Test start-up interlocks, water pressure, emergency stops and dust capture.

WHERE, WHEN AND WHO USES IT

The named presenter briefs the crew at the actual quarry face, crushing/screening line, dredging position or wash circuit before work or when the hazard, permit, shift or mine instruction changes. Connect every point with real mine rules, plant isolation, operator access boundaries and outstanding maintenance. Agree who controls the area and who must address unresolved conditions.

HOW TO COMPLETE AND RETAIN THE ORIGINAL

Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER. Discuss the six numbered checks against real equipment and conditions, recording unresolved actions in the relevant workpack. The editable A4 Word document provides 16 lines for NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE. Obtain each attendee's signature and file the briefing with the shift handover and applicable mine permit.

STOP, WITHDRAW AND MINE RELEASE

The original STOP / WITHDRAW / NOTIFY MINE CONTROL instruction addresses an unstable face, unguarded moving plant, overflowing pond or trapped aggregate release. Secure the affected task and notify mine control. Restart only after the mine-authorised official releases the zone or system; this signed talk is not a dredging permit, isolation certificate, discharge approval or automatic plant release.

THE SINGLE, PACKAGE OR COMPLETE FILE

This exact DOCX is R12.95 and already included in the 386-document Surface Mining Checklist Package at R2,315.95 (about R6 per form) and the complete 635-page Surface Mining Contractor H&S File currently R1,899.94. The full file includes all 386 forms, a complete contractor foundation and trade annexures. Test a Single before upgrading, but do not buy duplicates if you own the master.

AX-TT02 | SECTION AX | EDITABLE A4 DOCX

    bottom of page