380 - AX-R03 | Quarry Work Results & Measured Evidence Register
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Five eligible Singles for the price of four, ten for eight or fifteen for twelve while the current offer qualifies. Browse individual checklists. Confirm the discount in your cart.
380 / AX-R03 — QUARRY WORK RESULTS & MEASURED EVIDENCE
WHY THIS RESULTS REGISTER MATTERS
AX-R03 is a seven-row measured-results and evidence register for quarry crushing, screening, dredging and washing—not a general site checklist. It records what was actually observed or tested, the mine-controlled document reference and who accepts the result. That matters when a contractor says 'isolated' or 'tested' but supplies no reading, equipment reference or release decision.
SEVEN ACTUAL ITEMS IN THE SOURCE
1) Isolation of hydraulic, gravity and water energy at crushers, feeders and stackers. 2) Water intake, wash ponds and dredge anchoring/access. 3) Guards at screens, conveyors and crushers before maintenance. 4) Sediment settlement, discharge permits and turbidity restrictions. 5) Quarry-face rockfall, bench/crest stability and stockpile drawdown. 6) Traceability of replaced wear liners, mesh, spray nozzles and belts. 7) Tests of start-up interlocks, water pressure, emergency stops and dust capture.
WHERE, WHEN AND WHO COMPLETES IT
Use this original at the affected crusher line, quarry face, dredging equipment or wash circuit during execution, test verification or close-out. The contractor supervisor records genuine readings and evidence from the workpack. The mine release authority reviews results before handback. An unverified isolation, unsafe face or water discharge remains open; a completed field alone does not make a control safe.
ACTUAL PRINTED COLUMNS AND SIGN-OFF
Fill MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. For all seven numbered rows enter DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS alongside MINING-SPECIFIC ITEM / EVIDENCE TO TRACK. Attach permit numbers, tests, replacement-part records and measured results. Capture incomplete items in OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF. Finish with contractor-supervisor and mine-release-authority signatures plus date/release reference.
EVIDENCE IS NOT A MINING AUTHORISATION
This register supports an accountable decision; it is not a mine operating permit, lockout release or discharge approval. If interlocks, guarding, rockfall controls or readings fail, retain the defect and obtain the required official release before restart.
SINGLE FORM OR COMPLETE AVC COLLECTION
This editable Word form costs R12.95 and is already included in the 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File. The full file adds broader contractor management and trade annexures. Trial a Single to evaluate the technical record, but avoid purchasing duplicate documents if you own the master.
AX-R03 | SECTION AX | EDITABLE A4 MICROSOFT WORD

