378 - AX-TB-03 | Runway Friction Verification Before Reopening Talk
Buy 4 Checklists, Get 1 Free
THE ACTUAL AIRFIELD PAVEMENT CONTROL
AX-TB-03 is the authentic NINE-POINT runway workface toolbox talk titled PAVEMENT FRICTION VERIFICATION BEFORE REOPENING. Reduced runway or taxiway surface friction can threaten aircraft movement after rubber removal, high-pressure washing or surface treatments. Incorrect paint geometry and unverified surface status add operational risks. This original brief makes contractor crews consider the work boundary and reopening authority rather than assuming that a cleaned pavement may be handed back.
WHEN / WHERE TO USE THE ORIGINAL
Brief the team before a permitted runway or airside surface work window, especially before approaching an area scheduled to reopen to aircraft. Identify the airport location, actual permit, authorised escort, affected assets and approved work period. Discuss reduced friction warnings, aircraft movements, paint/marking geometry and who must check condition and authorise safe reopening. Escalate changed operating windows instead of relying on a dated crew sign-off.
SOURCE-VERIFIED NUMBERED GATES OR COLUMNS
The NINE actual briefing topics cover (1) work location, permit, escort, window and affected assets; (2) REDUCED FRICTION hazards; (3) INCORRECT PAINT GEOMETRY and changed conditions; (4) pavement friction verification and SURFACE STATUS; (5) no unauthorised isolation, bypass, barrier or stand/machine restart; (6) control FOD, tools and debris near aircraft/passengers; (7) verify APPROVED WORK WINDOW; (8) STOP and contact airport operations on conflicts, alarms or missing tools; (9) end-of-task FOD and permit-restriction transfer.
WHAT THE FORM RECORDS AND DOES NOT AUTHORISE
The Word source provides SITE/SHIFT VARIATIONS, QUESTIONS AND FOLLOW-UP ACTIONS, precisely 16 ATTENDEE NAME/EMPLOYEE NO. and SIGNATURE lines, plus FACILITATOR, DATE/SHIFT and WORK REF. Record unresolved surface status or paint geometry concerns and which person will obtain actual evidence. This talk does not itself conduct a calibrated runway friction test or authorise operating-airport reopening.
SOURCE-EXACT WORD, COMPLETE OPTIONS AND CART OFFER
AUTHENTIC SOURCE-ORIGINAL EDITABLE WORD: Buy this AVC DOCX individually for R12.95. It is already included in the 420-document Airports & Airside Checklist Package and the complete 659-page Airports Contractor H&S File, which contains the wider contractor management foundation. Avoid buying the same record twice. BUY 4 GET 1 FREE may apply to qualifying individual Singles while the automatic cart offer is active: 5 pay for 4, 10 for 8, 15 for 12; verify at checkout. Bundles are excluded. Airport operator work windows, permits, escorts, equipment acceptance and independent reopening authorisation are separate.
Browse AVC original Checklist Singles

