371 - AX-TB-02 | Runway Marking & Paint Cure Window Toolbox Talk
Buy 4 Checklists, Get 1 Free
PURPOSE — ACTUAL AIRPORT PAVEMENT FORM
AX-TB-02 is titled CRITICAL RUNWAY MARKING AND PAINT CURE WINDOWS, a genuine NINE-POINT crew toolbox talk for airfield pavement marking contractors. Incorrect line geometry, unexpectedly reduced surface friction and an aircraft movement window can make an apparently finished paint job unsafe. The original is a workface discussion and signed attendance record; it does NOT supply a coating manufacturer's cure certificate or measured runway friction approval.
WHEN THIS RECORD IS USED
Brief the marking and escort team before an approved runway/taxiway marking work window and whenever weather, application area, aircraft movements or handback schedule changes. Identify the exact airport asset, paint-marking location, permit, authorised escort and work time. Discuss paint geometry and actual surface status; any cure-time or marking specification acceptance must be supported by separate approved technical evidence and airport release.
PRINTED NINE-/EIGHT-POINT ORIGINAL
The NINE printed discussion points address (1) exact location, client permit, escort, work window and assets; (2) REDUCED FRICTION; (3) INCORRECT PAINT GEOMETRY and changing conditions; (4) SURFACE STATUS; (5) no unauthorised isolation, bypass, barriers, machinery or stand movement; (6) tools, dust, dropped objects, passengers and FOD protections; (7) APPROVED WORK WINDOW quality or function; (8) STOP and contact airport operations for alarms, conflicts, missing tools or incidents; (9) final FOD, material reconciliation and written permit restrictions.
OBJECTIVE PROOF AND RELEASE BOUNDARY
The authentic Word page provides SITE/SHIFT VARIATIONS, QUESTIONS AND FOLLOW-UP ACTIONS, exactly SIXTEEN attendee NAME/EMPLOYEE NO. and SIGNATURE rows, and FACILITATOR, DATE/SHIFT and WORK REF. Note unresolved paint/cure or operating-window questions for the competent reviewer. This talk proves a briefing occurred; it neither validates paint geometry nor permits aircraft to use newly marked pavement.
THE ORIGINAL WORD, LARGER OPTIONS AND DISCOUNT
AUTHENTIC SOURCE-IDENTICAL EDITABLE WORD: This original DOCX costs R12.95 as a Single. It is already included in AVC's complete 420-document Airports & Airside Checklist Package and in the 659-page Airports Contractor H&S File, which adds a wider safety management foundation. Avoid buying identical forms twice. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the actual cart promotion is active: five cost four, ten cost eight, fifteen cost twelve. Confirm at checkout. Airport permits, escorted access, surface/marking acceptance, operator-controlled work windows and external operational release remain mandatory.

