top of page

370 - AX-TB-01 | Night Rubber Removal & Surface Cleaning Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

PURPOSE — ACTUAL AIRPORT PAVEMENT FORM

AX-TB-01 is the source-original NINE-POINT TOOLBOX TALK for NIGHT RUBBER REMOVAL AND HIGH-PRESSURE SURFACE CLEANING on airport pavements. Rubber removal or pressure cleaning may change pavement grip and generate loose material while equipment works close to active aircraft systems. Night work reduces the margin for finding FOD or route conflicts. This crew briefing connects REDUCED FRICTION, SURFACE STATUS and APPROVED WORK WINDOW restrictions to the real runway maintenance task.

WHEN THIS RECORD IS USED

Conduct before the authorised night rubber-removal or cleaning shift, and repeat on changed weather, visibility, machinery condition, escort or airfield movements. Specify the exact runway/taxiway location, current closure permit, aircraft assets, escort and approved work window. Brief equipment controls, collection of removed rubber and water-related debris through site-specific actions. The printed original is a safety briefing; nozzle pressures, surface friction test results and operational reopening approval require separate evidence.

PRINTED NINE-/EIGHT-POINT ORIGINAL

Nine actual source talking points: (1) location, permit, escort, work window and assets; (2) REDUCED FRICTION danger; (3) INCORRECT PAINT GEOMETRY and changed conditions; (4) SURFACE STATUS; (5) do not improvise isolation, bypass, barriers, equipment restart or stand movements; (6) prevent dropped tools, dust, fumes and FOD affecting aircraft/passengers; (7) APPROVED WORK WINDOW check; (8) STOP and notify airport operations on aircraft conflicts, alarms or missing tools; (9) FOD reconciliation and written shift handback of unresolved permits.

OBJECTIVE PROOF AND RELEASE BOUNDARY

The editable source contains SITE/SHIFT VARIATIONS, QUESTIONS AND FOLLOW-UP ACTIONS, sixteen ATTENDEE NAME/EMPLOYEE NO. and SIGNATURE lines, and FACILITATOR, DATE/SHIFT and WORK REF. Record the actual night-work hazards, permit and escort details, restrictions and corrective actions. Signed attendance is not independent surface inspection or airport operational clearance.

THE ORIGINAL WORD, LARGER OPTIONS AND DISCOUNT

AUTHENTIC SOURCE-IDENTICAL EDITABLE WORD: This original DOCX costs R12.95 as a Single. It is already included in AVC's complete 420-document Airports & Airside Checklist Package and in the 659-page Airports Contractor H&S File, which adds a wider safety management foundation. Avoid buying identical forms twice. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the actual cart promotion is active: five cost four, ten cost eight, fifteen cost twelve. Confirm at checkout. Airport permits, escorted access, surface/marking acceptance, operator-controlled work windows and external operational release remain mandatory.

Browse AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports H&S File

    bottom of page