top of page

369 - AX-C02 | Runway Final Inspection & Airfield Handover Check

R 12,95Price

Buy 4 Checklists, Get 1 Free

PURPOSE — ACTUAL AIRPORT PAVEMENT FORM

AX-C02 is an authentic EIGHT-CHECK FINAL INSPECTION AND HANDOVER checklist for completed airfield pavement works. After marking, cleaning or surface treatment, the contractor must still account for aircraft movements, restricted work windows, INCORRECT PAINT GEOMETRY, FOD, operating barriers and temporary measures. Finishing physical work is not authority to let an aircraft use the runway or taxiway.

WHEN THIS RECORD IS USED

Use at the end of the permitted pavement work window and whenever a changed task is handed over to airport operations. Enter AIRPORT/WORK ZONE, ASSET/LOCATION, PERMIT/WORK PACKAGE and SHIFT/DATE. Reconfirm actual runway closure and reopening windows, airfield escort, visibility, marking layout and all residual restrictions. Present the airport custodian with factual evidence, including separately obtained acceptance of any surface testing or paint curing requirements.

PRINTED NINE-/EIGHT-POINT ORIGINAL

The eight printed Y/N/N/A controls are (1) aircraft/passenger/airline movements and authorised work window; (2) changed weather, wind, visibility, electrical state or stand use; (3) current escort/radio/driver/access and safety permits; (4) subcontractor limits, barriers and emergency routes; (5) continuing INCORRECT PAINT GEOMETRY controls; (6) APPROVED WORK WINDOW authority and evidence; (7) revised method, risk review and approval for task changes/bypasses; (8) people, vehicles, tools, FOD and outstanding hold points reconciled.

OBJECTIVE PROOF AND RELEASE BOUNDARY

Every row asks for EVIDENCE/DEFECT REFERENCE and Y/N/N/A. At the end record UNRESOLVED ITEMS/RESTRICTIONS, CONTRACTOR VERIFIED BY/SIGNATURE, AIRPORT RELEASE REFERENCE, EVIDENCE REF/CORRECTIVE ACTION and DATE/TIME/STATUS. The form supports a traceable handback; operator-issued reopening and aviation safety release are independent and may not be inferred from contractor ticks.

THE ORIGINAL WORD, LARGER OPTIONS AND DISCOUNT

AUTHENTIC SOURCE-IDENTICAL EDITABLE WORD: This original DOCX costs R12.95 as a Single. It is already included in AVC's complete 420-document Airports & Airside Checklist Package and in the 659-page Airports Contractor H&S File, which adds a wider safety management foundation. Avoid buying identical forms twice. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the actual cart promotion is active: five cost four, ten cost eight, fifteen cost twelve. Confirm at checkout. Airport permits, escorted access, surface/marking acceptance, operator-controlled work windows and external operational release remain mandatory.

Browse AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports H&S File

    bottom of page