366 - AX-C01 | Runway Task-Specific Pavement Prestart Checklist
Buy 4 Checklists, Get 1 Free
WHY THIS SOURCE-ORIGINAL AIRPORT FORM MATTERS
AX-C01 is the genuine NINE-ROW TASK-SPECIFIC PRESTART for pavement cleaning, rubber removal and runway or taxiway marking. A plan approved before the shift does not prove the surface, workfront boundary, aircraft routing or line geometry remains as authorised. REDUCED FRICTION and INCORRECT PAINT GEOMETRY may become aircraft risks unless supervisors verify actual SURFACE STATUS and the permitted operating window before starting.
WHEN AND WHERE TO USE IT
Complete immediately before entering the authorised work zone and repeat when weather, aircraft movements, work method or access conditions change. Fill AIRPORT/WORK ZONE, ASSET/LOCATION, PERMIT/WORK PACKAGE and SHIFT/DATE. Compare work order/drawings and surface section with the real barricades, escorts, competent personnel and concurrent crews. The prestart is site-specific evidence, never an automatic permission to reopen a runway.
ACTUAL PRINTED EIGHT OR NINE CONTROLS
The NINE original Y/N/N/A checks are (1) correct work scope, asset identity, drawings and isolation boundary; (2) airfield permission and current safety interface briefing; (3) competent personnel, authorisation, supervision and escort; (4) effective REDUCED FRICTION controls; (5) INCORRECT PAINT GEOMETRY barriers or exclusions; (6) SURFACE STATUS physically checked and evidenced; (7) APPROVED WORK WINDOW test, inspection and release requirements; (8) other trades, aircraft/vehicle routes, public protection and FOD; (9) STOP and notify airport custodian after any workfront/system change.
Y/N/N/A EVIDENCE, SIGNATURES AND RELEASE
For each numbered check, the Word table supplies Y/N/N/A and EVIDENCE/DEFECT REFERENCE. At the foot are UNRESOLVED ITEMS/RESTRICTIONS, CONTRACTOR VERIFIED BY/SIGNATURE, AIRPORT RELEASE REFERENCE, EVIDENCE REF/CORRECTIVE ACTION and DATE/TIME/STATUS. Missing approval or an unverified friction condition is an open restriction, not a satisfactory start. Airport operational or safety release must be independently issued.
EDITABLE WORD AND BUYING CHOICES
AUTHENTIC EDITABLE WORD: Buy the original source-identical DOCX as one AVC Single for R12.95. The identical form is already in the complete 420-document Airports & Airside Checklist Package and 659-page Airports Contractor H&S File, which also provides the wider contractor documentation framework. Do not buy an original twice. Eligible Singles may qualify for BUY 4 GET 1 FREE while the live cart offer applies: five pay for four, ten for eight and fifteen pay for twelve. Confirm checkout qualification; parent packages are excluded. Airport operator permits, escorted work windows, independent technical acceptance and reopening release remain external.
Browse original AVC Checklist Singles

