356 - AV-TT04 | Survey, Drones & Autonomous Fleet Shift Transfer
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying Singles: five for four, ten for eight or fifteen for twelve. Check the cart saving.
356 / AV-TT04 — SURVEY, DRONES & AUTONOMY SHIFT TRANSFER / CONTROLLED RESTART
This original one-page editable Word toolbox talk prepares surveyors, UAV operators, spotters and autonomous-fleet contractors for shift handover and controlled restart. It checks revised mine maps, software/settings changes, worker communications and release authority after surface or quarry mine operations.
WHY SHIFT HANDOVER AND RESTART ARE HIGH-RISK
A changed autonomous geofence, lost UAV link, wrong survey datum or unexpected machine movement can expose workers. The outgoing crew's statement is not authorisation to restart. AV-TT04 provides six specific briefings and an explicit stop-and-notify rule until mine control approves reactivation.
THE SIX ACTUAL PRINTED BRIEFING POINTS
1. Mine survey/fleet authority signs revised maps, safety-critical settings and reactivation. 2. Independently check recorded measurements, geofence changes and software revision. 3. Define spotters, communications and lost-link contingency for UAV/remote equipment. 4. Protect control network calibration and the geodetic datum from accidental reset.
5. Maintain remote-control fail-safe stop and proximity-alert function during testing. 6. Confirm fleet autonomous zones, geofences and exclusion boundaries before access. These are AV-TT04's actual six points, specifically addressing shift transfer and controlled restart—not a generic drone talk.
THE FORM'S REAL ATTENDANCE AND CLOSE-OUT
Complete MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER. Discuss workface responsibilities, changed conditions and current mine instructions. An ATTENDANCE table provides 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines, preserving a record of everyone briefed.
The printed STOP / WITHDRAW / NOTIFY MINE CONTROL instruction applies to lost link, unverified geofence, unexpected autonomous activation or survey anomaly. Restart requires release by the mine-authorised official. This talk never substitutes for actual UAV permissions, mine access authorisations or the plant/fleet restart approval.
SINGLE TOOLBOX TALK OR COMPLETE MINE PACKAGE?
Buy AV-TT04 alone for this exact shift-transfer briefing or to assess AVC's editable technical quality. The identical original is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and the complete Contractor H&S File with A–AA core controls and specialist annexures. Full-file buyers receive it already.
386-document Surface Mining Checklist Package
Complete Surface Mining Contractor H&S File
One licensed editable DOCX for internal project use, subject to the host's survey, UAV, autonomous-fleet and reactivation rules.

